Post by Weatherford
1,627,830 followers
A UK mine operator faced a significant HSE and operational risk from a poorly abandoned well located in the path of planned shaft sinking. With an uncemented borehole and a fish left in hole, the challenge was to intercept and fully remediate the well to eliminate potential fluid pathways. The Weatherford Integrated Services and Projects (ISP) team planned, engineered, and managed the full operation, using the CENTRO® platform to align teams, optimize execution, and successfully intercept and cement the wellbore. See how the team reduced risk and enabled operations to move forward. Read the full Real Result. https://lnkd.in/eAW5wws7 #MiningSolutions #LithiumWells #Logging #SustainableMining #NewEnergySolutions
Video Content