Post by VINCI Energies

553,498 followers

A pilot project for accelerated electrification in The Netherlands ⚡ In The Netherlands, the energy transition is gathering pace, requiring rapid adaptation of the high-voltage network. In the face of constantly growing demand for electricity, the electricity transmission network operator TenneT has launched the Bay Replacement Programme (BRP). The aim is to renovate obsolete electricity substations as quickly, safely and sustainably as possible while maintaining supply continuity. The BRP is based on a fundamentally industrial approach: to design modular, standardised substations with prefabricated components installed on skids. This method considerably reduces the installation time, minimises substation shutdowns and makes optimal use of human resources at a time marked by a shortage of qualified technicians. To manage projects in this innovative programme – the Goor substation in the east of the country – TenneT appointed Omexom. 🗞️ Learn more in the article 👉 https://lnkd.in/eZ5meYsE Omexom NL VINCI Energies NL Eddy Barelds #AgilityEffect #VINCIEnergies #VINCI Photo: ©VINCI Energies

Post content