Post by thyssenkrupp Uhde

77,004 followers

thyssenkrupp Uhde has been awarded the pre-FEED contracts by Fuella AS for the development of two large-scale green ammonia projects in the Port of Pecém, Brazil and the Port of Açu, Brazil. The PeGA and AçuGA projects target the production of 400,000 tonnes per annum (tpa) of green ammonia each, powered entirely by renewable energy. thyssenkrupp Uhde will deliver integration engineering across the entire facility, including electrolysis systems, balance of plant, and ammonia offloading infrastructure. These pre-FEEDs will enable Fuella to progress through commercial milestones and develop execution approaches, laying the foundation for world-class green ammonia production hubs. #thyssenkrupp #Uhde #Brazil #GreenAmmonia

Post content