Post by UGS GmbH - A Company Of Geostock
2,013 followers
The first trucks are rolling. Preparations for our upcoming geothermal drilling project in Potsdam are gaining momentum. While drilling has not started yet, the mobilization phase is already underway. Equipment is being prepared, inspected and assembled at our yard in Mittenwalde before being transferred to the project site. A successful drilling project begins with careful preparation. These are the first visible steps toward the next geothermal well. More updates to come. #Geothermal #Drilling #Engineering #RenewableEnergy #EnergyTransition #UGS