Post by Thermo Design Engineering Ltd
12,797 followers
Big milestone out on site last week! At 175 feet long, the second DeMethanizer tower for this phase was successfully stood. Seeing equipment of this scale go vertical, safely and without issue, is always a proud moment for our team. Beyond the lift, we also delivered another module to site 24 days ahead of schedule. This level of execution is the result of strong planning, a proven modularization strategy, and the dedication of our experienced teams as we move into the final stages of fabrication. We’re incredibly proud of the TDE team working behind the scenes to drive this progress. Successes like this are a credit to both our people and the strong collaboration we have with our client. #BuildingEnergy #TDE #OilAndGas #EnergyInfrastructure #ModularFabrication