Post by TBM Consulting Group Europe
4,402 followers
New equipment is not always the answer to a capacity problem. In this case, the opportunity was already inside the operation. This industrial pipe manufacturer captured $1.7M in operational benefits without new capital investment by improving flow, productivity and shop floor management. The case shows what can happen when leaders look beyond output targets and start addressing where time, labour and capacity are being lost in the daily operation. Read the full case study: https://lnkd.in/e3SGjDQF #OperationalExcellence #TBMConsultingEurope