Post by Sulzer Chemtech
38,123 followers
Turnarounds are expensive. Multi-contractor projects even more so. The scope: new structured packing, a redesigned MellaTech liquid distributor, and KnitMesh V Mister and Mellachevron mist eliminators for precise entrainment control. The timeline: 15-18 days from start to finish. The outcome: optimized CO₂ and H2O levels at the reactor inlet, extended catalyst life, and up to $1.9M in savings per cycle. Download the case study for the full story: https://bit.ly/4aUokO1