Post by Sub Sea Services AS
5,454 followers
5 Year PM, a full strip, clean and inspect, repairs and pressure testing to DNV standards carried out by Sub Sea Services and our partner ExPert Riser Solutions USA for Drilling contractor + Oil Major Operator. The Pump Interface Joint (PIJ) is an integral part of the Controlled Mud Level (CML) system based on existing rig riser. Each rig demands a unique design to meet the client and rig interface criteria. Sub Sea Services goal is to be able to support our clients worldwide with our supplied products, from initial design right through to decades of use and re-certifications. In this project there were no NDT or WT failures, and only replaceable parts were needed to complete the scope. By supplying a robustly engineered product, the cost of ownership is greatly reduced. Followers #riser #subsea #drilling #drillship #MODU #solutionsprovider #turnkey #projectmanagement #recertification #partnerships