Post by Socomec Group
183,702 followers
Energy Efficiency Directive (EED) compliance for data centers >500kW is entering a concrete new phase. With the launch of the 2025 European data collection campaign and the latest regulatory clarifications, one message is becoming clear: datacenter compliance is no longer just an administrative requirement. It now depends on the ability to collect, consolidate, and report reliable, complete, and actionable data. The real challenge is to retrofit the right equipment seamlessly without disturbing the load and to rely on energy data that is accurate, precise, and usable. Without a clear view, there can be no relevant optimization, no robust benchmarking, and no lasting compliance. Accurate, real-time energy metering is therefore becoming essential, with sufficient granularity to drive decisions by tracking flows between: – PDUs , RPPs and Busways – UPS systems – cooling systems – IT loads #WhenEnergyMatter #EnergyEfficiencyDirective