Post by SCHWING Group

15,557 followers

S 43 SX at Work in Duisburg’s Inner Harbour 🌉 During the replacement of the Ruhr Bridge in Duisburg’s Inner Harbour, a SCHWING S 43 SX, operated by BZM, was used to place concrete for the new bridge abutment during the construction of the temporary bypass bridge. With a 42.3 m vertical reach, a maximum output of up to 162 m³/h, and a flexible 5-section RZ placing boom, the S 43 SX is designed to meet the demands of challenging infrastructure projects. Combining high pumping performance with precise boom control, it delivers the versatility and reliability required across a wide range of job site conditions. #schwing #schwinggroup #schwingstetter

Post content