Post by Schindler Group
451,066 followers
Talk about a project with its share of ups and downs! In 1989, an earthquake destroyed San Francisco’s elevated freeway, leaving the overpass-level entrance of 201 Mission Street stranded in mid-air. Decades later, the lobby has moved down to the street and our U.S. team is bringing the elevators down to meet it. The team in the U.S. is thinking outside the box and testing technical solutions for this one-of-a-kind project. Read more 👉 https://lnkd.in/dW3targH #Schindler #WeElevate #SanFrancisco #elevators