Post by Saipem
2,232,391 followers
We have completed the lifting operations of the gas recovery module for the Bouri Gas Utilization Project (BGUP), offshore Libya, using its flagship #Saipem7000, one of the world’s largest crane vessels. The module, fabricated by Rosetti Marino Group of Companies at its Marina di Ravenna yard on our behalf, #EPCI main contractor for the Bouri project, represents a key component of the plant. The module left the yard to be transported to the Bouri field, located approximately 170 kilometres off the Libyan coast. The lifting of the module marks a major milestone in the execution phase of the project, confirming our ability to manage complex operations through advanced engineering planning and the use of heavy-lifting solutions, in full compliance with the highest standards of safety and reliability. The Bouri Gas Utilization Project, developed by Mellitah Oil & Gas (a joint venture between Eni and National Oil Corporation), aims to recover associated gas currently subject to flaring, the controlled combustion of excess gas that produces the typical flame visible in refineries or wells, and transport it to the Mellitah complex for use or export. Read more: https://lnkd.in/dyaYiRnS #Saipem #EngineeringForASustainableFuture #BouriProject