Post by Mubashir Pervez C.

Mechanical Design Engineer | CSWP Certified | Electromechanical Systems | Industrial Equipment

Quick reality check for quality and inspection teams 👇 Ballooning a drawing, listing every characteristic, assigning instruments, building the inspection report template, all of it by hand. How long does ONE complex drawing actually take you (or your team) end-to-end? Curious to see where the industry really sits. Drop a comment if your number is wildly different from the options, would love to hear what's eating the most time (Ballooning? Tolerance? Transcription? Formatting the report?). #QualityEngineering #Manufacturing #Inspection #GDandT #Ballooning #FAI #PPAP #QualityControl #Metrology #MechanicalEngineering #ProductionEngineering #LeanManufacturing #SmartManufacturing #Industry40 #QMS #CMM #DimensionalInspection #ManufacturingTech #QualityAssurance #Engineering #GD&T