Post by KREISEL Electric
21,790 followers
Power2Drive 2026 Munich had one key question: How do we enable efficient ultra-fast charging where the existing grid reaches its limits? Our answer: Power Sharing 480 Charging expert Markus Kaser is explaining this new feature. It takes the KREISEL CHIMERO 240 to the next level. Combining two battery-integrated chargers into one intelligent system. Unlocking up to 480 kW charging power even with limited grid capacity. This opens up entirely new possibilities: Bringing High-Power Charging to locations that were previously considered challenging or even unviable. For operators, this means: • Faster time to revenue • Lower grid and infrastructure costs • Access to high-demand locations • Maximum performance with minimal compromise A strong step forward as we continue to close the gap between growing e-mobility demand and existing grid constraints. A big thank you to everyone who visited us and engaged in great conversations throughout the event. #ChargingStation #ChargingInfrastructure #Tankstelle #Hotel #Gastgewerbe #Tourismus #Electromobility #Ladestation #Ladeinfrastruktur #Elektroauto #Flottenmanagement #Elektromobilität
Video Content