Post by Kamal Soleimani

-Founder & Senior Engineering Consultant SEP Engineering Team | Marine, Industrial & Infrastructure Projects

Time-laps of a 24 meter high and 22 meter diameter concrete grain silo within 7 days in the Chabahar port,Iran. The construction of the 100,000 ton silo of Shahid Beheshti port of Chabahar with a dynamic capacity of 600,000 tons per year started in November 2020. The largest fully mechanized grain silo in the southeast of the country, equipped with an unloading system and two transfer lines from the docks with a capacity of 1,200 tons per hour, was designed and will be operationalized next year. The 100,000-ton grain silo of Shahid Beheshti port of Chabahar was implemented with the aim of accelerating the unloading and increasing the storage capacity of basic commodities; This project, as one of the economic factors of the country's port, will have a great impact on reducing the costs of transportation and storage of goods. #CivilEngineering #StructuralEngineering #PortEngineering #MarineEngineering #ConcreteConstruction #SlipForm #GrainSilo #BulkMaterialHandling #Infrastructure #Engineering #ProjectManagement #InfrastructureDevelopment #MarineStructures #Timelapse #Chabahar

Post content

Video Content