Post by Holcim
1,103,416 followers
60 000 people. Every single day. That’s how many rely on Los Chorros Highway. How are we transforming it to shape a safe, more resilient, connected future for El Salvador? Upgrading this section of the Pan American Highway to carry up to eight lanes was a massive undertaking in a mountainous region prone to extreme weather and earthquakes. Holcim is supplying integrated high-value building solutions from end-to-end, backed by strong on-the-ground expertise, to ensure the project is successful: • 25 low-carbon concrete mix designs • 254 000 m³ of ECOPact low-carbon concrete will be supplied • 60 000 m³ of demolished pavement used to make new concrete with ECOCycle • Cutting-edge slip-form paving machines to lay the new highway Above all, we're connecting a country and its people. Los Chorros Highway is built to last, with Holcim inside. Discover this Building Icon: https://lnkd.in/efEyC8Mm #NextGenGrowth #BuildingIcons
Video Content