Post by Hilti Group

557,628 followers

Quick quiz πŸ‘‡πŸ€” At the Y1 semiconductor project in South Korea, modular construction is applied at massive scale. 🧩🏭 If all the modular support systems for pipes and ducts that were used on the project were laid out end to end, how far would they go? πŸ—οΈ A 780 m (the length of about 7-8 football fields ⚽) B 50 km (equal to almost six times the height of Mount Everest πŸ”οΈ) C 870 km (similar to the distance between Seoul and Shanghai ✈️) The scale says it all and highlights the growing shift toward modular construction for high-tech facilities. πŸ”—Discover the full story: https://lnkd.in/dR2HfMQD

Post content