Post by Hilti Group
557,628 followers
Quick quiz ππ€ At the Y1 semiconductor project in South Korea, modular construction is applied at massive scale. π§©π If all the modular support systems for pipes and ducts that were used on the project were laid out end to end, how far would they go? ποΈ A 780 m (the length of about 7-8 football fields β½) B 50 km (equal to almost six times the height of Mount Everest ποΈ) C 870 km (similar to the distance between Seoul and Shanghai βοΈ) The scale says it all and highlights the growing shift toward modular construction for high-tech facilities. πDiscover the full story: https://lnkd.in/dR2HfMQD