Post by Giatec

49,859 followers

Six plants. Nearly 1,000 active mixes. Hours of manual spreadsheet work every single week. That was quality control at Conewago Manufacturing before SmartMix®. Here's where they are now: ✅ 25% less testing ✅ 12+ hours saved every week on mix analysis ✅ Submittals built 75% faster ✅ 4x faster through data review The difference is AI. Roxi™, Giatec's AI engine, surfaces predictive insights across all six plants at a glance, so their QC team acts earlier and with more confidence. A mix analysis that used to eat up an hour now takes 10 minutes. "We did a pretty extensive search, and this was the only option at the time. There was nothing else on the market like this system." - Dylan Meade, QC Manager, Conewago Manufacturing, LLC. Read the full case study to see how they did it 👉https://hubs.ly/Q04lHM_r0 #ReadyMixConcrete #ConcreteOptimization #SmartMix

Post contentPost contentPost content