Post by Faller Packaging
5,989 followers
šŖšµš²šæš² š±š¼š²š šš¼ššæ š½š®š°šøš®š“š¶š»š“ š¹š¶š»š² š¹š¼šš² šš¶šŗš² ā šš¶ššµš¼šš š¶š ššµš¼šš¶š»š“ šš½ š¶š» šæš²š½š¼šæšš¶š»š“? In many lines, the additional effort does not come from the machine itself, but from here: ā the coordination between folding carton and leaflet What this means in practice: a separate feeder system for the leaflet an additional set-up step during format changes a second component that needs to be procured, inspected and supplied separately š§šµš¶š š¶š š²š š®š°šš¹š ššµš²šæš² ššµš² šš¼šŗšÆš¶ š£š®š°šø š°š¼šŗš²š š¶š»: the folding carton and leaflet arrive as one pre-assembled, verified unit. What this removes from the operation: no separate feeder for the package leaflet no second material flow one complete set-up step eliminated šš±š±š¶šš¶š¼š»š®š¹ š¶šŗš½š®š°š: ā less coordination between two components ā reduced inspection and logistics effort (one delivery, one goods-in check)