Post by EthosEnergy

83,364 followers

⚡ How to meet rising energy demand with new gas turbine lead times exceeding 5 years? At ASME (The American Society of Mechanical Engineers) Turbo Expo 2026 in Milan, our VP Engineering Massimo Valsania will share practical insights on how gas turbine operators can address today’s challenges - without waiting years for new assets. Join the joint panel discussion to explore how circular economy strategies - proven through real-world projects - are becoming a critical lever for the energy industry, including: • Extending gas turbine lifetime to defer capex and boost reliability • Relocating assets to meet demand without new build delays • Maximizing fleet value through improved performance 📅 June 17 | 10:30 AM - 12:00 PM - Allianz MiCo, Milan, Italy 👉 Register today: https://lnkd.in/ePJSyuw As capital timelines stretch, value creation shifts from new builds to optimizing and redeploying existing assets. Let’s connect in Milan and continue the conversation. #ASME #TurboExpo2026 #GasTurbines #CircularEconomy #PowerGeneration #Engineering #AssetManagement

Post content