Post by E.ON Drive Infrastructure
10,708 followers
ā” šŖš² šµš®šš² š¼š½š²š»š²š± ššµšæš²š² š»š²š š°šµš®šæš“š¶š»š“ šš¶šš²š š¶š» ššµšæš²š² š°š¼šš»ššæš¶š²š ššµš¶š šš²š²šø. šš¶šæšš ššš¼š½: šš²š²š±š. Ten ultra-rapid bays are now live at St George's Retail Park in Middleton, South Leeds. ā 5 Ć Alpitronic 200 kW chargers, 10 charging bays ā 8 standard bays plus 2 enhanced-accessibility bays ā Direct access to the M1, M62 and M621 ā Aldi, B&M, Costa, Greggs, McDonald's and Subway on the doorstep The retail park opened in 2024 and pulls steady all-day footfall from local residents and passing motorway traffic. The mix earns its keep: drivers can top up during the weekly shop, over a coffee or on a lunch stop, and leave with a usable charge. It is now one of the largest ultra-rapid charging destinations in South Leeds, and it runs on 100% certified renewable energy like every EDRI site across our 11 European markets. Two more openings to come this week. ššš¶š¹š šš¼ šŗš¼šš² šššæš¼š½š². #EVCharging #EDRI #Leeds #UltraRapidCharging #BuiltToMoveEurope