Post by ENERCON
379,796 followers
ENERCON in Iceland: A major milestone on the way to 120 MW Despite challenging conditions in southern Iceland, significant progress has been made at the Vaðölduver site. The first turbine was completed on schedule – a strong sign of things to come for the rest of the project. This milestone impressively demonstrates what is possible through strong teamwork, precise planning and great dedication – and provides momentum for the next construction phases. Major project with a signal effect 🔹 28 x E-138 EP3 🔹 Hub height: 81 m 🔹 Total capacity: 120 MW Logistics of the highest standard: 🚛🗺️ ✅ Heavy haulage six evenings a week ✅ Route of around 120 km from the port to the wind farm ✅Transport through five municipalities ✅The largest heavy haulage operations in Iceland to date It is Iceland’s first large-scale wind farm built exclusively with ENERCON technology and makes an important contribution to diversifying the energy mix alongside hydro and geothermal power. “It was a tremendous achievement by our team to keep to the schedule under these conditions – many thanks to everyone involved,” says Project Manager Katarzyna Ralowiec." #ENERCON #WindEnergy #Renewables #Iceland #EnergyTransition #Teamwork #Infrastructure #Sustainability