Post by Concept

3,327 followers

We’re proud to reflect on the conservation refurbishment delivered at St George’s Church, Bulford. Working in partnership with KBR, Inc., we completed a full mechanical and electrical replacement alongside extensive fabric repairs within this historic site. The scope included a new Low Temperature Hot Water system, upgraded heating, full electrical infrastructure renewal, and installation of a Category L1 fire alarm system, Building Management System, and integrated PA. Alongside the services upgrade, we carried out significant roof, stone and timber repairs, including stained-glass conservation and internal refurbishment works. Delivering this programme required careful coordination to protect the church’s heritage features while integrating modern systems. Early design engagement, detailed surveys and collaboration with conservation specialists ensured all works preserved the building’s character. The project was also delivered adjacent to an active military environment, requiring strict planning to avoid disruption. The result is a safe, compliant and efficient facility, ready for long-term use while maintaining its architectural integrity. 👉 Learn more: https://lnkd.in/e6yRh5zE #Refurbishment #Heritage #BuildingCompliance #FireSafety #Decarbonisation

Post contentPost content