Post by Chris Petersen

Offshore Manager Available for Work | Project Management, Logistics Management

🐊 Introducing the Subsea Coning Calculator — built by Blue Gator Subsea, LLC After 30+ years in deepwater Gulf of America operations, I've seen what happens when the coning math doesn't get done before the lift begins. The coning principle isn't complicated — but with a load in the water, a vessel starting its move, and an ROV on the wire, the last thing your team needs is doing the calculations in their head. So I built a tool that does it for them. The Subsea Coning Calculator solves two critical questions: ā–¼ Deploy — At what load depth can the vessel begin transit without breaching the SOZ cone? ā–² Recovery — How far must the vessel travel before the crane can begin recovering? Inputs: water depth, SOZ%, crane speed (m/s), vessel speed (knots), HOB, inspection depths, ROV threshold. The output is one number — the trigger point — handed directly to the crane operator and the bridge. Full cone boundary verification at every step of transit. āœ” Deploy AND recovery modes āœ” Rigging inspection holds modeled āœ” ROV monitoring alerts per SOP āœ” Visual cone diagram + timeline table āœ” Mobile and desktop — no app, no login Your customer's SOZ policy exists for a reason. This tool makes sure your team executes to it — every lift, every time. šŸ”— Try it free: https://lnkd.in/eBBx9SUw Working in deepwater construction, IMR, SURF, or RLWI? Share this with your offshore team. #SubseaConstruction #OffshoreOperations #DeepwaterLifting #SURF #IMR #OffshoreTools #BluegatorSubsea #GulfOfAmerica