Post by Anuj Gupta

Country Manager - India at HYTORC

73% reduction in flange time is the kind of number that makes a shutdown planner sit up. A pumping station in Veracruz was dealing with two compounding problems: not enough tools to keep crews moving, and reaction arm hazards putting operators at risk on every joint. Switching to the HYTORC STEALTH combined with the HYTORC Washer resolved both at once. The STEALTH's low-profile design accessed confined spaces where standard tools couldn't fit. Multi-tool simultaneous bolting brought a single flange job from 5.5 hours down to 1.5. No reaction arm means no pinch points. Zero rework on completion. The context matters for India: refineries scaling rapidly, turnaround windows getting shorter, global integrity standards being applied to domestic operations. The approach that delivered these results in Mexico is directly applicable to the next major shutdown on the subcontinent. Full case study: https://lnkd.in/eqsUzz7h #RefineryMaintenance #IndiaPetrochem #HydraulicTorqueWrench #ShutdownTooling #SafeBolting #India #HYTORC

Post content