Post by ALTRAD

105,090 followers

Unexpected disruption ⏩️ Immediate response. Following a fire that made the main conveyor unavailable, our teams delivered a temporary conveyor solution in record time at the ArcelorMittal site. From parallel engineering studies to 60m structural lifts, every step was completed with safety at the forefront. Proud of a team that turned an emergency into success.

Post content

Video Content