Zuhair Ahmed Razzaqui

Assistant Manager at K-Electric

Karāchi, Sindh, Pakistan

About

Accept and enjoy the new situation and challenges, make positive contribution towards the given position the wealth of the organization and enhance the knowledge, abilities and skills through organization any contribution.

Experience

  • K-Electric (11 yrs 10 mos)
    • Assistant Manager
      Nov 2023 - Present · 2 yrs 9 mos

      Supervised a team of electrical technicians in executing corrective maintenance activities for electrical systems, ensuring timely resolution of issues and adherence to safety protocols. Implemented preventive maintenance strategies to minimize equipment downtime and enhance reliability, resulting in a 20% reduction in corrective maintenance incidents. Coordinated with maintenance planners and operations teams to schedule corrective maintenance activities, optimizing resources, and minimizing disruptions to production. Conduct root cause analysis of equipment failures to identify underlying issues and implement corrective actions to prevent recurrence. Arranging and conducting training sessions regarding newly developed SOPs. Participated in preventive maintenance programs to identify potential electrical issues proactively and prevent unplanned equipment failures. Provided training and guidance to junior technicians on electrical maintenance procedures and best practices. Contributed to the development of maintenance schedules and strategies to optimize equipment reliability and performance. Design projects and execution of new 11KV system as per site dynamics with following budget Optimization. Implemented standard risk management routines to identify project risks, develop risk mitigation and contingency plans and implement action plans to reduce or eliminate project risks. Followed highest standards relating to Health Safety and Environmental (HSE) and PSM practices are adhered, Site visits MSA as per required criteria and taking care of yearly and quarterly audits conducted by HSE teams. Ensuring the proper usage of PPEs and SPEs on site. Ensuring proper toolbox talk (TBT) through site visits. Ensure proper MV, LV, substation shutdown and underground maintenance jobs are executed according to defined KE SOP and HSE protocols. Work to minimize incidents/accidents and injuries to achieve the objective of Zero accident.

    • Assistant Engineer (Shift Incharge)
      Oct 2014 - Oct 2023 · 9 yrs 1 mo

      Design projects and execution of new 11KV system as per site dynamics with following budget Optimization. Implemented standard risk management routines to identify project risks, develop risk mitigation and contingency plans and implement action plans to reduce or eliminate project risks. Arranged planned and forced shutdowns for corrective maintenance, preventive maintenance of system and improvement purposes as per SOP on the 11KV network of the system. Led completion & supervise of HOTSPOT maintenance of LT-HT and 11KV feeders and Electrical instruments as per safety protocols and keep their record with schedule checks and ensure corrective actions, responsible for the good quality work. Created new loops through SLD design to interlink for back feeding and stimulated new feeders, sub-stations, and PMTs. Performed RCA of the system failure and devised proactive measures from reoccurrence. Sustained & continuously improved reliability of operations, maintenance. Develop strategies, for timely restoration of the power breakdown as per standards parameters. Examined and created project reports against each goal within the timeframe and submitted final updates to higher management. Installed all types of equipment of HT switchgear, panels including 11kv / 0.4kv distribution transformers (Delta /Star) of various ratings. Followed highest standards relating to Health Safety and Environmental (HSE) and PSM practices are adhered, Site visits MSA as per required criteria and taking care of yearly and quarterly audits conducted by HSE teams. Worked on power distribution system MV/LV Power distribution Network. Which include Overhead, Underground, Substations, Switchgears and MV/LT switch panels, Transformers Executed system improvements projects to improve system reliability.Conducted and attended training/sessions for Safety Protocols, Electricity Act 1937, NEPRA power safety codes, Sindh OSH act 2017 & Rule 2019, Sindh Environmental protection Act

  • Assistant Account Manager at Zameen.com
    Aug 2014 - Sep 2014 · 2 mos

    Making irresistible sales pitches to prospective clients. Identifying decision-makers within targeted leads to begin the sales process. Penetrating all targeted accounts and radiating sales from within client base. Meeting daily targets determined by the company. Streamlining and optimizing your performance in order to maximize results. Building sound, lasting relationships with clients to fuel the company’s growth. Achieving targets within deadlines. Planning for and executing new deals and developing new clients. Regularly following up with existing clients via phone and email to cross-sell and up-sell. Keeping clients up-to-date with the latest company and sales information. Renewing contracts with clients at set time intervals. Maintaining clear client sale records in database. Visiting clients regularly. Bring in the business for company. Cold-calling prospects generated by external lead sources.

  • Customer Sales Representative at Airmen Golf Course and Recreational Park
    Apr 2013 - Jul 2014 · 1 yr 4 mos

  • Production incharge at International Rubber Industries
    Jun 2009 - Apr 2013 · 3 yrs 11 mos

    Production Coordinator, International Rubber Industry (Manufacturer & Exporter of Rollers) June 2010 – 2013 • Quality control during final finishing phase of rubber products • Packing and dispatch of products according to customer orders Stock managment, International Rubber Industries (Manufacturer & Exporter of Rollers) May 2009 – to June 2010 • Maintaning stocks of rubber, finshed and unfinished rubber and ebonite rollers • Maintaning stocks of raw materials (Silver, Metal, Aluminium)

  • Final Inspection at Autocom A/S
    Feb 2008 - Jun 2009 · 1 yr 5 mos

    Checking Goods at final stage