Senegal
Experienced Assembly Chief with a demonstrated history of working in the energy industry. I work as Assembly Senior Chief,planning and organization for installation all static and rotary equipments(Steam/Gas Turbine, Air Cooled Condenser etc.), isometric drawing of pipes by me in accordance with project specifications. Currently,I work as Assembly Chief, at 1 x 240 TPH CFBC BOILER project, in which coal handling plant included. During this project I have particularly experienced interpreting technical information and coordinated with various departments and implemented all workflow orderly. Skilled in Decision-Making, English, Creative Work, Management, and Flexible Scheduling. Strong operations professional with a Bachelor's degree focused in Mechanical Engineering from Gaziantep Üniversitesi.
Relocation Project of 2x115 MW CCPP existing plant to be assembled in Uzbekistan.
Installation of 1x140 TPH Biomass Fired Boiler(Aalborg Energie Technik A/S),Steam Turbine,Air Cooled Condenser.
Mechanical installation of Central Heating Systems and controlling of installed systems.Preparing technical conditions of Bid Documents about mechanical works.
It was fertilizer complex plant, included 32 MW Steam Turbine TYPE: KP-32-6.1 (Doosan Skoda Power) and Air cooled Condenser (B&W SPIG Company).
Installation of a Geothermal Power Plant which has 96 MW capacity(Toshiba TYPE:TYO:6502 72 MW steam turbine and Ormat Binary system 24 MW,) within the scope of Zorlu Enerji A.Ş.