In my current position as an Executive Engineer at LTA, I am working on Additions & Alterations (A&A) projects for all the railway lines in Singapore for Integrated Supervisory Control System (ISCS), Access Management System (AMS), Building Management System (BMS) and Fence Intrusion Detection System (FIDS). In my previous position as an Installation Engineer at Alstom, I work on the upgrading of the Operational Control Centre (OCC) for the BPLRT Project, one of the light rail projects in Singapore. I monitor on-site installation progress, review and produce safe work method statements, assist the installation manager on planning and reporting, and ensure smooth and timely completion of payment milestones. - Achievement from the project: 1) Successfully delivered the migration of Existing OCC to Interim OCC. 2) Managing, planning and executing the migration project. I have over six years of experience in the railway industry, specializing in installation and testing works on signalling and non-signalling equipment. I started my journey as an intern at Bombardier Transportation, where I gained valuable knowledge and skills on the BPLRT Project, and continued with them after graduating from Singapore Institute of Technology with a Bachelor of Engineering in Sustainable Infrastructure Engineering (LAND) with Honours. I joined Alstom in 2021 after the acquisition of Bombardier by Alstom. I am passionate about sustainable and innovative solutions for the transportation sector, and I enjoy collaborating with different stakeholders and teams to deliver high-quality results.
BPLRT Project - Successfully delivered the Interim Operational Control Centre (iOCC) and Migration from existing Operational Control Centre (eOCC) to iOCC - Kick off the documentation and on-site job for the upgrading of Existing Operational Control Centre (EOCC) - Monitoring on-site Installation progress - Review of Safe Work Method Statement - Review of Installation Drawing - Producing of Safe Work Method Statement - Manage and produce 4M checklist in accordance to Alstom requirement - Ensuring site situation and site personnel follows Alstom EHS requirement - Assisting Installation Manager on Progress Reporting - Assisting Installation Manager on Schedule Planning - Assisting Installation Manager on Manpower Deployment Planning - Ensuring on-site progress are smooth to meet Payment Milestone - Provide knowledge of experience to new joiners in the team