Young Liu

Petroleum Engineer at ATX Oil LLC

Pearland, Texas, United States

About

- Experience in data collection, geology analysis, reservoir evaluation, reserve estimation, economics evaluation, workover, drilling, field service and project planning - Double masters - Master in Petroleum Engineering / Master in Drilling Engineering Goals: Reservoir / Petroleum Engineer (production, drilling or field service) Willing to be relocated anywhere

Experience

  • Petroleum / Reservoir Engineer at ATX Oil LLC., Houston, TX
    Jun 2011 - Present · 15 yrs 2 mos

    - Collected data (geology description, well log, core, well test and production data) - Summarized geology description, log analysis and volumetric reserve estimate - Conducted reservoir analysis, material balance and decline curve analysis - Conduct project evaluation, development plan preparation (considering well rework, pump, workover, drilling, hydraulic fracturing, water flooding and other stimulations) - Prepare project proposal (technical part) and participated in business meeting - English / Chinese Interpretation

  • Department of Petroleum Engineering, Texas A&M University, College Station, TX (3 yrs 11 mos)
    • Reservoir Simulation Research Associate
      May 2010 - May 2011 · 1 yr 1 mo

      Unconventional Reservoirs Simulation and Well Performance Evaluation: - Built simulation models, and decline curve evaluation workflow - Conducted history matching for vertical and horizontal wells - Estimated OOIP, OGIP, EUR, reserves, and evaluated reservoir quality - Evaluated horizontal completion strategies and stimulation designs

    • Research Assistant
      Jul 2007 - May 2010 · 2 yrs 11 mos

      • Uncertainties in Shale Gas Resource Estimates: Reviewed and summarized the diverse shale gas resource estimates and production forecasts; investigated methods to reduce the uncertainties

  • China National Petroleum Corporation Service & Engineering Co. Ltd (3 yrs 3 mos)
    • Field Engineer
      Jul 2005 - Jul 2007 · 2 yrs 1 mo

      - Participated in drilling, well completion, workover and hydraulic fracture service - Designed and conducted well testing services - Prepared the final reports and assisted the HSE management

    • Drilling Engineer
      May 2004 - Jun 2005 · 1 yr 2 mos

      - Coordinated in well design, completion design and procedure recommendation - Prepared the cost estimates, AFE report and participated in bids activities - Followed the drilling and completion operations on site

  • Research Assistant at Department of Drilling Engineering, China University of Petroleum (Beijing)
    Sep 2000 - Apr 2004 · 3 yrs 8 mos

    • Well Information Monitoring and Forecasting System: Studied and evaluated a new rheological model and applied it in the hydraulic calculation for a Drilling Information System program using Visual Basic language

  • Field Technician at Jiangsu Oil
    Jul 1999 - Aug 2000 · 1 yr 2 mos

    - Constructed oil /gas gathering stations and the downstream pipelines