Willem van den Noort

Head of Engineering Royal IHC

The Randstad, Netherlands

About

Experienced Program Manager with a demonstrated history of working in the shipbuilding industry. Strong program and project management professional and MT member. Skilled in Dredging, Project Implementation, Change Management, Creative Problem Solving, Offshore, and Energy.

Experience

  • Head of Engineering at Royal IHC
    Sep 2024 - Present · 1 yr 10 mos

  • Project Director at Oceanco
    Dec 2021 - Jul 2024 · 2 yrs 8 mos

  • Royal IHC (8 yrs 1 mo)
    • Project Director CSD Spartacus
      Dec 2018 - Nov 2021 · 3 yrs

      CSD Spartacus is the largest and most powerful ship of her type in the world. The combination of power, size and new innovations makes mega cutter ‘Spartacus’ a new benchmark in the dredging industry.

    • Manager Engineering - Cutters & Special Dredging Equipment
      Nov 2016 - Dec 2018 · 2 yrs 2 mos

      As member of the Shipbuilding Engineering Management Team responsibilities include planning, resources, processes and performance of the engineering department. Hierarchical manager of the Team Leads Engineering Cutters & SDE. Coaching and assisting Team Leads Engineering in approach of projects, defining priorities, opportunities/risks and budget hours. Responsible for the supervision on engineering of all Cutter & SDE projects. Representative of Engineering in Project Boards, Gate Review meetings and for other stakeholders.

    • Sr. Project Manager
      Nov 2013 - Nov 2016 · 3 yrs 1 mo

      - Project Manager of new build of Pipe Lay Support Vessels for Subsea 7, the 'Seven Rio', Seven Sun and Seven Cruzeiro The PLSVs are designed to operate in 3000m water depth, and are equipped with a pipelay system for installing flexible flowlines and umbilicals, including a lay system tower with 550t, top-tension capability, twin underdeck baskets, for storing up to 4000t of flexible flowlines, and two state of the art ROVs.

  • Project Manager at IHC Offshore & Marine
    May 2010 - Oct 2013 · 3 yrs 6 mos

    - Project Manager of new build of 4 Pipe Lay Support Vessels for Subsea 7, the 'Seven Waves' and 3 based on a similar design. The PLSVs are designed to operate in 3000m water depth, and are equipped with a pipelay system for installing flexible flowlines and umbilicals, including a lay system tower with 550t, top-tension capability, twin underdeck baskets, for storing up to 4000t of flexible flowlines, and two state of the art ROVs. - New build of Cutter Suction Dredger AMBIORIX for DEME. With its total installed power of 28.000 kW one of the most powerful cutter dredgers in the dredging industry. The ship is self-propelled, and is fitted with a barge loading system. The flexible spud system allows operations in larger swell, allowing higher productivity and working in challenging conditions. http://fotorondleiding.nl/ambiorix/launchambiorix.html

  • Project Manager at IHC Beaver Dredgers
    May 2011 - Mar 2013 · 1 yr 11 mos

    New build of a Custom Built Cutter Suction Dredger.