Stazzano, Piedmont, Italy
supervisor earthmoving and tunnel excavation responsible Rcc compacted roller processing 37 years working experience
Earthmoving Supervisor Assistant of 7th level during construction of rockfill dam, site staff and equipment management for specific construction works on structures and dam construction phase. Responsible for supervision and coordination of site personnel and subcontractors, ensuring all work activities are carried out safely and delivered to a high quality. Reporting/recording of any required deviations and regularly liaising with line manager and client regarding all SHEQ issues. To construct and deliver the allocated section of work within a specified timeframe with correctly allocated resources. Monitor progress of works against programmeassistant to blasting, construction of berms and narrowexcavation areas.
Located in the Karas region along the Fish River in the south of the country, the project is the first phase of the Neckartal Irrigation Scheme. Made from roller-compacted concrete (RCC) and standing around 80 metres high, the Neckartal dam will harness water from the Fish River to produce energy and to create a reservoir capable of holding 857 million cubic metres of water, which will be used to irrigate 5,000 hectares of land for the agricultural development of the area. A crossing and a pumping station, along with the relevant intake structure, will be built 13 km downstream from the dam. The water will flow through an 8.7 km steel pipe with a diameter of 1,100 mm to reach a reservoir that is also part of the project
2008 – up today Earthmoving Supervisor Assistant during construction of RCC DAM in Etiopia, Gibe III – Omo river Human resources and equipment management in specific locations, in a wide site, asking for rock and soil handling: rock excavation, assistant to blasting, construction of berms and narrow excavation areas. Management of RCC placing, spreading and compaction. Equipment operator for RCC placing and spreading with excavator and loader during enrichment by Grouting of RCC Experience < 2.600.000 mc RCC WORLD RECORD RCC PLACED in 24Hrs: 16405 mc (01/02/2013) WORLD RECORD RCC PLACED in 1 month : 250805 mc (08/2013) with single conveyor line Salini Costruttori SpA – Rome , Etiopian Branch
Earthmoving Supervisor Assistant during construction of rockfill Dam in Nigeria – Gurara DAM Human resources and equipment management in specific locations, in a wide site, asking for rock and soil handling. Management of silt spreading for Dam core and execution of rip-rap protection Salini Nigeria LTD – Lagos (Nigeria)
Human resources and equipment management asking for rock and soil handling; lime stabilization works of rehabilitation and empowering of high speed railway AV Napoli - Milano Operator of excavator, loader and cranes Asfalti Sintex SpA - Bologna
Equipments operator and human resources and equipment management; assistant of earthmoving Superintendent for empowering and doubling of high speed railway AV Firenze - Bologna Operator of excavator, loader and cranes for gallery works; management of earthmoving at site. Ghella Carena SpA - Rome