Rixensart, Walloon Region, Belgium
- Airport connectivity with the Network Manager - Airport Capacity studies - Pre-tact and tactical support to Airports (Airport Function) - Airport Network Digital Data Centre (airport corner) - Runway throughput solutions (R&D to deployment)
- Airport connectivity with the Network Manager - Runway throughput solutions (R&D to deployment) - Capacity studies - Pre-tact and tactical support to Airports (Airport Function) - Airport Network Digital Data Centre (airport corner)
- RECAT-1 Europe – Aircraft re-categorisation for capacity improvement - Project Manager - SJU Project 6.8.1 - Flexible and Dynamic Use of Wake Vortex Separations - Project Manager - S2020-PJ02 - Increased Runway and Airport Throughput - Project Manager
- Casa CN235 avionics upgrade contract – ICS System for maritime patrol and surveillance aircraft for Turkish (MELTEM) and Indonesian Air Force (IDAF) - MACS-ICS certification process (DGA)
- A380 Wake Vortex encouter risk assessment / simulation - Flysafe Project – Test and validation of a complete Next Generation Integrated Surveillance System (NG ISS)
ATC-Wake Project – ATC system I-Wake Project – Avionics system AWIATOR Project – Aircraft wing with advanced technology operation