Viktor Travynskyi

Rope Access Technician IRATA 2

St John’s, Newfoundland and Labrador, Canada

About

I am an enthusiastic, self-motivated, reliable, responsible and hard working person. I am a mature team worker and adaptable to all challenging situations. I am able to work well both in a team environment as well as using own initiative. I am able to work well under pressure and adhere to strict deadlines. Working outside in all weather conditions has been part of my life for years. I have always been a part of the construction industry working hand in hand with heavy equipment being well aware of the risks that surround me daily. Highly capable of following plans and procedures, with ‘a no job is too big or too small’ attitude, good, clear communicator able to work, communicate and interact with different cultural dynamics and liaising between all levels. Enthusiastic with a great work ethic, a good motivator, I function well in a team and can both command others

Experience

  • Rope Access Technician IRATA Level2/ aerial field technician at WesTower Communications Ltd.
    Jan 2025 - Apr 2026 · 1 yr 4 mos

  • Rope Access Technician IRATA Level 2/ Ariel field technician at Vertical Specialties Inc.
    Jun 2023 - Jan 2025 · 1 yr 8 mos

  • Rope Access Technician IRATA Level 2 at AMAKO
    Aug 2022 - Jan 2023 · 6 mos

    installation of metal structures

  • Rope Access Technician IRATA 2 at Taiyo Europe GmbH. PROMALP. Freelance.
    Feb 2022 - Jul 2022 · 6 mos

    installation and tensioning of the safety net when using the tensioning equipment of electric or mechanical tensioning devices and installation of the membrane.Tight connection of the membrane by soldering.

  • Rope Access Technician IRATA 1 at PFEIFER Group. KLM Tech. Freelance
    Dec 2018 - May 2020 · 1 yr 6 mos

    Installation of cables and membranes for the retractable roof of the All Vacrah stadium. Istallation and installation of a screw roof structure, installation and installation of segments with a membrane stretching them and tight connection of the membrane by soldering on All-Tumama stadium