VIJAYAKUMAR MANIVASAGAM

Deputy Construction Manager-Civil || SEVEN Project, Jeddah, KSA|| Mega Projects || Underground Metro -Mumbai,India || Elevated Metro, Riyadh, Ksa || FIFA world cup stadium, Doha, Qatar || Residential Project ,India||

Jeddah, Makkah, Saudi Arabia

About

Experience

  • Senior Engineer at Shapoorji Pallonji Mideast LLC, KSA
    Jul 2024 - Present · 2 yrs 1 mo

  • Project Engineer- NEOM at Bechtel Corporation
    Nov 2023 - Jul 2024 · 9 mos

  • Larsen & Toubro (12 yrs 4 mos)
    • Assistant Construction Manager
      Sep 2020 - Oct 2023 · 3 yrs 2 mos

      Mumbai Metro Underground Project, Mumbai ,Maharashtra, India *Execution of Blockworks Internal & external Rooms as per approved IFC drawings * Execution of Flooring works like granolithic flooring, granite flooring, Vitrified tiles flooring, Raised fill flooring and Raised access flooring as per issued IFC drawings * Execution of cladding works like dry wall cladding , granite wall cladding, ceramic wall tiles, granite column cladding , SS wall cladding works as per issued IFC drawings * Execution of False ceiling works like Metal baffle ceiling, square metal panel ceiling, as per issued IFC drawings *Execution of installation of metal doors & Iron Mangeris as per approved materials *Execution of Installation of Fire Rated & Non fire rated rolling shutters as per approved materials *Execution of wall plastering works by using approved Ready mix materials *Execution of MS Canopy works in All station Box entry exit areas as per approved materials *Execution of SS& MS handrails works in ALL station box and entry exit areas as per approved materials *Execution of external plastering works & Texture painting works of ancillary building as per approved materials * Execution and handing over the Rooms to the clients as per project requirements * CWIR / MIR raised to consultant for inspection. * Co -ordination with MEP / other agency of works at site. * coordinating with Consultant / Client to meet with project requirements to maintain High standards of safety & Quality Requirement. *Preparation of daily / Weekly / Monthly work done progress Reports. * Preparation of monthly subcontractor bills every months * Preparation of daily activity of works / Workmen Report send to Planning Department for updating site progress. * Preparation of monthly Reconciliation Report. * Preparation of BBS – basic elements of Block works RC structure Window, Doors, Other openings & services.

    • Senior Civil Engineer
      May 2017 - Sep 2020 · 3 yrs 5 mos

      Alrayyan FIFA World Cup stadium,Doha, Qatar * Execution of Flooring works like Self level screed, Epoxy Resin flooring, Carpet flooring, Vitrified Tiles flooring as per issued IFC drawings * Execution of cladding works like dry wall cladding , granite wall cladding, ceramic wall tiles, granite column cladding , SS wall cladding works as per issued IFC drawings * Execution of False ceiling works like Metal baffle ceiling, Gypsum ceiling, Acoustic ceiling, square metal panel ceiling, as per issued IFC drawings *Execution of installation of metal doors & Iron Mangeris as per approved materials *Execution of Installation of Fire Rated & Non fire rated rolling shutters as per approved materials *Execution of wall plastering works by using approved Ready mix materials *Execution of SS& MS handrails works in ALL station box and entry exit areas as per approved materials * Execution and handing over the Rooms to the clients as per project requirements *Execution of Toilet waterproofing and sanitary fixing of the same as per approved IFC Drawing & Materials * CWIR / MIR raised to consultant for inspection As well As closing of WIR after completion of works from clients for Billing. * Co -ordination with MEP / other agency of works at site. * coordinating with Consultant / Client to meet with project requirements to maintain High standards of safety & Quality Requirement. *Preparation of daily / Weekly / Monthly work done progress Reports. * Preparation of monthly subcontractor bills every months * Preparation of daily activity of works / Workmen Report send to Planning Department for updating site progress. * Preparation of monthly Reconciliation Report. * Preparation of BBS – basic elements of Block works RC structure Window, Doors, Other openings & services. * Site Team organizing Junior Staff / Foreman / Specialized Agency Works to execute the works as per IFC drawing

    • Site Civil Engineer
      Sep 2014 - May 2017 · 2 yrs 9 mos

      Riyadh Metro Project, Riyadh, Saudi Arabia 🖎 Execute the Structure works with issued IFC drawings for the Post Tensioned Slabs / Beams. 🖎 Execute the Structure works with issued IFC drawings for the Foundation, columns, walls and Slabs / Beams. 🖎 Formwork Using High Standards of DOKA with Heavy duty tower System. 🖎 Logistic Plan for the concrete pouring / Structure work Installation Truss works Erection & Dismantling. 🖎 Preparation & Executing the works for the BBS -Foundation /Columns / Beams / PT Slabs –Post Tendon Laying works co-ordination. 🖎 Metro – Foundation Piers / Precast Beams Erection works coordinating with specialized sub-contractor. 🖎 Execution civil Structure works with High Standards of Safety & Quality with Project requirements without LTI. 🖎 CWIR / MIR raised to consultant for inspection. 🖎 Co-coordinating with MEP / other agency of works at site. 🖎 Preparation of daily / Weekly / Monthly work done progress Reports. 🖎 Preparation of daily Productivity for the Formworks / Concreting works activity of works / Workmen Report send to Planning Department for updating site progress. 🖎 Preparation of monthly Reconciliation Report

  • Site Engineer at Larsen & Toubro Limited, Riyadh, Saudi Arabia (KSA)
    Sep 2014 - Jul 2017 · 2 yrs 11 mos

    Riyadh Metro Rail Project ( Elevated )– Saudi Arabia

  • Site Engineer at Larsen & Toubro Limited, Chennai- INDIA
    Mar 2012 - Sep 2014 · 2 yrs 7 mos

    DLF Commanders Court (Residential project)