Túlio Fusco Ferreira

Logistics Manager

Sorocaba, São Paulo, Brazil

About

I have large experience in managing and controlling processes time and costs focusing as well as managing staff and resources appropriately. Therefore my professional and personal base lead me to become an analytical, balanced when managing conflicts and under high pressure, motivated for challenges person.

Experience

  • Gerente de logística at Envalior
    Jul 2026 - Present · 1 mo

  • Supervisor de operações at Mercado Livre
    Sep 2021 - Jun 2026 · 4 yrs 10 mos

  • Logistics Coordinator at CNH Industrial
    Sep 2018 - Aug 2021 · 3 yrs

    I responsible for supply of small pieces (bolt an washer) for all assembly line and Resupply of the paint system with the Manufacture parts storage and supply of the Combines sub-assembled in the assembly lines in kit forms as sequencing the assembly line according to the Pack list of each machine model. Creation and Management of KPIs (Safety, Quality and Cost) Supplier performance analysis Control of internal and external inventories Daily analysis of critical parts

  • Caterpillar Inc. (8 yrs 1 mo)
    • Section Manager
      Jun 2017 - Sep 2018 · 1 yr 4 mos

      Leader team in Logistics Division, in this charge I developed supply chain skills and leading a staff as well. Responsive for indirect material, after that KIT and bullks for TTT and CP machines.

    • Analyst process
      Jan 2014 - May 2017 · 3 yrs 5 mos

      I have worked as Analyst process since January 2014 this position I am in charge to find local source and reduce cost in row material.

    • CPS-Black Belt
      Sep 2011 - Dec 2013 · 2 yrs 4 mos

      In this position I improved my skills with control and communication therefore I graduated about 14 Green belt that I worked with different projects (Safety, Manpower, Quality, logistics, mantenence and reduce cost. Highlight in Reduce cost with chemicals in plant of treatment of waste water, even though this project was recognized together the corporation.

  • Factory leader at Metalplix
    Jul 2007 - Oct 2009 · 2 yrs 4 mos

    I worked as team leader on floor shop, there I was responsible for receiving row material for all process until the final process. In my team there were around 100 staffs on three shifts and I reported directly for Industrial manager.