Torben Jens Eriksen

Senior Director

Hørsholm, Capital Region of Denmark, Denmark

About

I am a committed and responsible person with more than 20 years of experience in the power plant business. During the years I have held positions in Construction as Project Director, General Manager of subsidiaries in Lebanon and Suriname, resident Site Manager in Malta, Bahamas, Suriname and Lebanon and General Manager of Procurement. Also I have been stationed in the Philippines as Director and General Manager of BWSC Mindanao, Inc. responsible for the Operation and Maintenance of 2 Power Barges each 100 MW. Recently my experience has been extended further as a project of which I'm responsible was subject to a dispute which was referred to ICC in Paris, France. In that connection I have gained knowledge of how to execute a court case at ICC in Paris, France and at the same time negotiate a possible settlement with with the client.

Experience

  • CIP Terra Technologies (Full-time · 2 yrs 11 mos)
    • Director, EPC Management
      Aug 2025 - Present · 11 mos

    • Project Director
      Aug 2023 - Aug 2025 · 2 yrs 1 mo

  • Burmeister & Wain Scandinavian Contractor A/S (21 yrs)
    • Project Director
      Oct 2014 - Present · 11 yrs 9 mos

      Construction of a 194 MW Power Plant in Zouk, Lebanon (10 x MAN 18V48/60) and a 78 MW Power Plant in Jiyeh, Lebanon (4 x MAN 18V48/60). Both Power Plants are installed with Exhaust Gas Heat Recovery Boilers and a Steam Turbine Generator which increases the efficiency of the Power Plants significantly.

    • General Manager, BWSC Construction Ltd., Lebanon
      Nov 2013 - Feb 2026 · 12 yrs 4 mos

      Construction of a 194 MW Power Plant in Zouk, Lebanon (10 x MAN 18V48/60) and a 78 MW Power Plant in Jiyeh, Lebanon (4 x MAN 18V48/60). Both Power Plants are installed with Exhaust Gas Heat Recovery Boilers and a Steam Turbine Generator which increases the efficiency of the Power Plants significantly.

    • Project Director & Branch Manager
      Feb 2020 - Dec 2022 · 2 yrs 11 mos

      Expansion of the EBS DPP II Power Plant in Paramaribo from 84 MW to 126 MW by installing an additional 2 x 21 MW MAN 18V48/60 TS Diesel Engines and their auxiliaries.

  • Chief Executive Officer at Tønder Biogas A/S
    Aug 2023 - Mar 2025 · 1 yr 8 mos

  • Senior General Manager, PurLog at A. P. Møller - Maersk A/S
    Dec 2004 - Jun 2005 · 7 mos

  • General Manager, Procurement at Burmeister & Wain Scandinavian Contractor A/S
    Dec 1999 - Nov 2004 · 5 yrs