Tino David

Maintenance Planner |Maintenance Planning | Scheduling | KPI | Procurement | Inventory Management | Estimation | SAP MM | BOM Analysis

Ras Tanura, Eastern, Saudi Arabia

About

Experienced Maintenance Planner with a demonstrated history of working in the oil & energy industry. Skilled in AutoCAD, Petroleum, SAP ERP, EPC, and Oil & Gas. Strong operations professional with a Visveswaraya Institute of Engineering Technology focused in Mechanical from The Institution of Engineers (India).

Experience

  • Maintenance Planner SMP at aramco
    Apr 2022 - Present · 4 yrs 3 mos

    Oil Refinery

  • Maintenance Planner SMP at Yanbu Aramco Sinopec Refining Company (YASREF) Ltd.
    Mar 2020 - Dec 2021 · 1 yr 10 mos

    oil Refinery

  • Mechanical Engineer at Arabian FAL Company
    Aug 2014 - Nov 2019 · 5 yrs 4 mos

    Work in Saudi Aramco – Ras Tanura Refinery as “Planner” (Contract Employee’ from the company Arabian Fal Co), from NOV-14 to OCT-19 Job Profile: • Prepare detailed job step plans in proper execution sequence, with details of craft man-hour and crew size requirements for each step. • Visit job sites when necessary to determine special job requirements. • Ensure that materials are on-site prior to scheduling each job and that surplus and excess materials are returned to the proper materials handling personnel for eventual return to the Storehouse. • Arrange for and schedule support service equipment, to coincide with the work order scheduling. • Participate in the Weekly/Schedule Coordination Meeting and present the weekly schedule of workable maintenance jobs from the backlog. • Finalize the weekly schedule for Operations approval. • Prepare daily schedules from the approved Weekly Schedule and coordinate daily schedules with the Maintenance Foremen, Supervisor and Operations Foremen and ensure that a complete planning package is attached to the work order. • List, edit and check all issued minor maintenance tickets (MMT) and plan/schedule work. Update maintenance order statuses as to whether jobs are workable or unworkable, percentage completion, estimated completion date, reasons for delay and all other pertinent information. • Develop and support the implementation of effective Maintenance Management Systems ensuring that maximum benefits in efficiency and response are achieved. • Quantity Surveying and Cost Estimation of maintenance jobs by Contractors

  • Maintenance Planner at Aramco
    Nov 2014 - Oct 2019 · 5 yrs

    Oil Refinery

  • Project Engineer at Petron Saudi Contractinng Co. LLC
    Feb 2012 - Aug 2013 · 1 yr 7 mos

    Petron Saudi is a company engaged in Construction in Kingdom of Saudi Arabia, is the subsidiary of Petron Emirates, U.A.E and having many overseas projects Project: Potline Bulk Material Handling System for Aluminium Project Facilities of ALCOA - Ma’aden at Raz Al Khair, Saudi Arabia. Client: Saudi Arabian Bechtel Company. Job Profile • Responsible for the erections and installation of Steel Structure, Silos, Equipments and HDPS System • Preparation of Work Method Statements. • Preparation of Job Safety Analysis. • Preparation of Technical and Commercial Project Documents – Technical Query, Estimation of Extra Jobs and its Claims on basis of Contract Change Notice(CCN), Deficiency and Damage Reports, Supporting Documents for Field Surveillance Reports(FSR). • Reporting to the Construction Manager/ Planning Department. • Co-ordinating with Planning Department for preparing the Level -5 Project Schedule. • Preparation of Weekly report • Coordinate Manpower, Material and Equipments to ensure that all activities as per schedule in stipulated time with quality. • Progress updating, Evaluation & Preparation of progress reports involving critical activities governing the Project and review of corrective actions, recovery plans to keep the project on the track. • Preparation of daily crew allocation and equipment allocation report to the management. • Daily site inspection with EPCM representatives. • Safety walks around with the clients Achievements  Complete First Material Handling System for “First Hot Metal on 12-12-12”.  Co-ordinate 3000MT of structural erection and Silos.  Successfully handled more than 1100 packages of material for equipment in “Material Handling System” supplied by Coperion- Germany  Coordinating Pre-commissioning and Commissioning activities