Manager with 20 years of international project delivery experience on very large infrastructure projects/ experience in NATM and SEM/ excavation and lining of shallow cover tunnel/ soft ground roadheader excavation/ tunnel excavation techniques/ ground support and shotcrete lining/ excavation in underground/ excavation under water/ cut and cover structures/ structural steel and concrete/ canopy tubes/ waterproofing/ tunnel monitoring/ jacking box

Experience

  • Executive Director at KAFRIL UNTERNEHMENSGRUPPE
    Mar 2020 - Present · 6 yrs 4 mos

  • PORR Group (Magdeburg, Sachsen-Anhalt, Deutschland)
    • Project Manager Verkehrsknoten Magdeburg
      Mar 2019 - Feb 2020 · 1 yr

      Renewal of five railway overpasses in close proximity to Magdeburg's Central Station. Construction of a cut and cover tunnel below the present road level to separate the motorized private traffic from the remaining traffic flows such as trams, pedestrians and cyclists.

    • Site Manager - Verkehrsknoten Magdeburg
      Oct 2017 - Feb 2019 · 1 yr 5 mos

      Renewal of five railway overpasses in close proximity to Magdeburg's Central Station. Construction of a cut and cover tunnel below the present road level to separate the motorized private traffic from the remaining traffic flows such as trams, pedestrians and cyclists.

  • John Holland (Sydney, Australia)
    • Senior Tunnel Project Engineer - WestConnex 1b/ M4 East
      Mar 2016 - Sep 2017 · 1 yr 7 mos

      The Joint Venture CPB Contractors – Samsung – John Holland has been selected by WestConnex Delivery Authority (WDA) to design and construct Sydney’s M4 East Motorway. WestConnex is Australia’s largest transport infrastructure project. Seven kilometres in total length, the M4 East will join the M4 Widening at Homebush Bay Drive and provide a 5.5 kilometre tunnel with three lanes in each direction from the M4 at North Strathfield to Parramatta Road and the City West Link, Haberfield. The CPB John Holland Samsung JV partners have extensive experience in tunnelling and major infrastructure delivery in Australia and internationally.

    • Senior Tunnel Project Engineer - Arncliffe Pedestrian Link
      Jan 2015 - Feb 2016 · 1 yr 2 mos

      The project includes a 30 m long shared pedestrian and cycle underpass through an embankment beneath four live passenger rail tracks. The underpass is being constructed as a mined tunnel with large diameter canopy tubes without disruption to rail services. Fully responsible for planning, procurement and implementation, including site mobilisation, installation of monitoring systems, ground treatment, fibreglass dowels, canopy tubes, excavation and lining of the underpass.

    • Senior Tunnel Project Engineer - North Strathfield Underpass
      Jul 2013 - Dec 2014 · 1 yr 6 mos

      The project includes a 148 m long rail underpass to enable freight trains to traverse beneath four live passenger rail tracks. The underpass was constructed as a mined tunnel without disruption to rail services. Responsibilities included: Analysis/selection of plant for tunnel excavation, including procurement for all tunnel plant Developing Activity Method Statements (AMS) Installation of canopy tubes, shotcrete lining, installation of rock bolts and tunnel services Settlement monitoring system Construction of acoustic shed Site power distribution, water treatment plant and ventilation systems

  • Tunnel Project Engineer - M2 Upgrade Tunnel Section at Leighton Contractors
    Jul 2011 - Jun 2013 · 2 yrs

    The Hills M2 motorway links the North West region to the lower north shore and Sydney’s CBD. The project is technically challenging, with construction taking place in a live motorway environment, working a rotating roster with three different crews 24 hour per day, 7 days per week. Responsibilities and duties included: Analysis/selection of plant and equipment for excavation inside and outside the tunnel, planning, scheduling, co-ordination of site activities, subcontractor management, daily coordination with M & E team and shift instruction. Cost control and analysis, highlighting the emerging trends where actual costs deviate from planned within the forecasted budget of tunnel construction. Responsible for forecast, 3 week look ahead program, QA records, on site quality control, production monitoring, supervision of operations and subcontractors, contract and claim management, procurement, site logistics, development of SHESWMS, CMS, PCP’s and checklists, carrying out constructability reviews, liaising with the designer on design related issues (RFI), producing weekly reports.

  • Civil Engineer - Airport Link Brisbane Toombul Section at Thiess
    Sep 2008 - Jul 2011 · 2 yrs 11 mos

    SHIFT ENGINEER – TOOMBUL SECTION – CC420 JACKING BOX The project involved the construction of Twin 3-lane road tunnels 2.3 km long, twin 2-lane road tunnels 2.8 km long, 2.8 km of underground ramps and twin 2-lane bus lane tunnels 1.5 km long, working 24 hours per day, 7 days per week rotating roster with three different crews. Responsibilities and duties included: Analysis/ selection of plant and equipment for construction of jacking and base slab, planning, scheduling, co-ordination of site activities and subcontractor management. Cost control and analysis, highlighting the emerging trends where actual costs deviate from planned within the forecasted budget of the jacking slabs and jack boxes construction. Responsible for QA records, on site quality control, production monitoring, supervision of operations and subcontractors, procurement, site logistics, development of JSEA’s, WMS, ITP’s and checklists, constructability reviews, liaising with the designer, producing weekly reports, design of monorails for smoke duct beam installation. SHIFT ENGINEER – TOOMBUL SECTION – CC410 LAUNCH BOX The CC410 team worked on a 24 hour, 7 day continuous roster with three crews. Duties included: Analysis and selection of plant and equipment for bulk earth works (mobilised a 150 tonne crawler crane with a bell skip – 11.40m3 capacity)/40m3/h compacted volume of excavation. Planning, scheduling, co-ordination of site activities and subcontractor management. Cost and budget control and highlighting emerging trends where costs deviate from budget for excavation, quality assurance records, production monitoring, supervision of operations and subcontractors, procurement, site logistics, development of JSEA’s, ITP’s and checklists, liaising with design issues.