Tibor MOLNAR

Innovation and Technology Manager - Organisation and Process Development Specialist

Keszthely, Zala, Hungary

About

Experience

  • Innovation and Technology Manager - Organisation and Process Development Specialist at Freelance
    Feb 2023 - Present · 3 yrs 5 mos

    My mission is to lead businesses out of perpetual firefighting and leaders out of the merry-go-round. Simple, transparent, standardized processes that give managers back their time and employees back their psychological security help me do this.

  • General Manager at PharmaPrint Ltd.
    Oct 2020 - Mar 2023 · 2 yrs 6 mos

    Full responsibility for operation Projects: • Executive search, recruiting and hiring Finance Mgr, Supply chain Mgr and Manufacturing Mgr. • Gemba walk introduction • Value stream mapping, significant waste reduction and material flow improvement • project regarding 10% green energy with 54Kw solar system supply • complete lighting change to LED tech. 160 LED lamps • ERP system change from Navision to SAP. • heat pump system with humidity and temperature control, instead of evaporator • production lines refurbishments and new production line design • early customer involvement in new product introduction production design • warehouse capacity improvement from 400 to 650 pallets with shelf layout design • Annual Energy Audit introduction • Energy consumption and waste reporting to Statistic Authority and German Karta • Keep annual EHS training

  • Senior Engineering Manager at ABB
    2017 - 2020 · 3 yrs

    Leadership of 5 different department as Engineering, Machine Maintenance, Facility, Project management and Indirect purchasing. 5 department leaders reporting to me directly. There were all together 50 heads in my organization. Direct reporting to site Senior Executive Operation Manager. Team member of Site Exit process including transfer and contracts preparation, and asset sales. • NPI, Lean Management, Automation group, Manufacturing Engineering, Machine maintenance, Facility departments, VCP project management team (Variable Cost Projects) and Indirect purchasing. • Daily support for Supplier Quality team regarding metal parts supply chain. • Kaisen and daily Gemba walk introduction • Replacement Quality manager during 8 months. • Responsible for budget (400K USD/Q) forecast, CAPEX, and KPI monitoring. • As team member of site strategic management, responsible for site configurations. • Focus on Dfm, to cooperate with Spanish and German teams about design • With Automation team, focus automation solution for production line in soldering, cold metal forming and test areas. • Organizing soft skill trainings, mechanical design, lean and leadership training. • Functional reports: Quarterly budget, people forecast for P&L, Forecast variance report. Monthly variable cost improvement and DL headcount calculation. Weekly cost variance report. • Bulid and maintain clean room about ISO14644-1 Class 4-5 regarding relay production. • complete lighting change to LED tech. 400 LED lamps • humidity and temperature control implementation • Annual Energy Audit introduction • Energy consumption and waste reporting to Statistic Authority • vehicle fleet management ( 8 company cars ) • improve EHS standards regarding cleanroom activity

  • Jabil (Tiszaújváros)
    • Head Of Engineering
      Jun 2012 - 2017 · 4 yrs 8 mos

      Managing of Test, Change Management (NPI, ECO), Automation, Maintenance, Industrial and Manufacturing Engineering departments on SMT, all together 400 employees. Manage and lead Project Management Office, and develop Project Manager experts. Direct reporting to site operation manager. My direct reports are 1 Test Manager, 1 NPI Manager, Industrial Eng Manager, Manufacturing Eng Manager, 1 Maintenance group leader, 1 Automation group leader, PMO team leader, FMEA moderator • Responsible for budget (300K USD/Q) forecast, KPI monitoring and coaching my team about continuous improvement and LEAN thinking. As team member of site strategic management, responsible for site configurations. • Create Quote/Dfx team, with support Design For Manufacturing at customer side. • Build Automation team, mainly focus on to Automotive customers from easy automation to customized solution as complete production line. Reach pilot site about own automation process in the company. • With LEAN tool usage 10% OLE improvement within one year on Automotive sector. Best in class in Jabil. • Main focus on to Automotive sector assy area KPIs, best practice sharing with other production areas. ( QRQC, gemba walk, Kaisen blitz and A3 etc.) • Organizing cross functional and soft skill training, PI and PDP, human development for lead engineers. • Recruiting and Hiring talents for Project Management office • Functional reports: Quarterly budget and people forecast for P&L, Forecast variance report. Monthly LEAN improvement and DL headcount calculation. Weekly cost variance, OEE, OLE, Down Time, ECO report • Crisis management as Logistics Manager between Sep 01.2016.– Feb 15.2017. • Managing shop floor inventory and warehouse, all together 650 employees. • Direct reporting to site operation manager. My direct reports are 1 Inventory supervisor, 2 warehouse Manager, 1 Logistic Development Manager • Responsible for warehouse capacity improvement project, with build and rent solution.

    • Program Manager
      Nov 2006 - May 2012 · 5 yrs 7 mos

      • Operational Manager of factory in the Factory. • Responsible about build clean room area and process for high quality cleanness touch screen BB and GV products. ( ISO14644-1 class 5 ) • Responsible for 3 products during mass production. Responsible for forecast, budget, shipment and customer satisfaction. I have complex Customer Focus team with buyers, Engineers, Quality engineers, logistic guys, production planners and manufacturing team. • Responsible for all of change management inside the business. Responsible for new product introduction and ECO process, Quote, cost analysis for budget forecast, prototype and validation builds with Dfx process and start up production. All of them were in same time with 2-3 different products in different life time phase. • Report to Assistant Site Operation Manager • Functional reports: Quarterly budget and people forecast for P&L, Forecast variance report. Monthly OTD, capacity plan, cost variance, E&O report. Weekly cost variance, OTD, capacity and production plan, ECO report

    • Project Engineer
      Feb 2001 - Oct 2006 · 5 yrs 9 mos

      • Responsibles for designing and installing new production lines and preparing the technological documentation. My task is optimization of the Set Top Box production line and continuous improvement. Quotating of new products, preparing Design For Manufacturing ( DFM ) and new products introduction. Implementation of Lead Free Soldering Process in this factory. Preparing forecast for headcount, equipment and machine costs • 4 Engineers reported to me directly • Report to Manufacturing Engineering Manager • All together 4 Engineers, 2 ECO coordinators, and 16 technicians were in my organization

  • Assistant station leader at MOL Logistics
    1996 - 2001 · 5 yrs

    • Responsibles for technical lead of MOL Logistics Truck loading station and installation of same logistic system at other location (in Füzesabony) • Manage monthly and annual physical inventory. • 4 shift leaders reported to me directly • Report to Site Manager • All together 4 shift leaders, and 8 operators were in my organization