Thomas NEUT

Project Management at ExxonMobil Corporation

Le Havre, Normandy, France

About

Project Management Professional with 18+ years of experience in Project management and Execution for Major Capital Projects ranging from $100M to $8B. Experience includes delivery of Upstream, Downstream and Chemical projects from Pre-FEED till Commissioning, in domestic and international environment.

Experience

  • ExxonMobil (18 yrs 7 mos)
    • Project Execution Supervisor - Site Portfolio Projects
      May 2022 - Present · 4 yrs 3 mos

      Scope : • Accountable for end-to-end delivery of a $250M Brownfield Project Portfolio, overseeing an annual CAPEX investment of $50M. • Led and mentored a high-performing team of 18 direct reports across engineering, project management, and support functions, driving execution excellence and cross-functional alignment. Key Achievements : • Drove the “Direct to India” strategic implementation at site, significantly enhancing project cost competitiveness and achieving top-quartile benchmarking performance. • Developed a high-impact partnership with LTTS Engineering Contractor. Drove measurable gains in engineering delivery performance. • Led an organizational transition to a globally integrated operating model, fostering international collaboration and operational agility. Enhanced organizational effectiveness, resulting in measurable improvements in delivery performance, resource utilization, and stakeholder engagement. • Recruited, coached, and developed Junior Project Managers, developing leadership and strengthening project execution capabilities.

    • Project Engineer / Interface Lead - LNG Projects
      Jul 2020 - Apr 2022 · 1 yr 10 mos

      Scope : • Russia Far East LNG Project. $9B+ LNG Plant designed as a single train treatment and liquefaction process with a nominal LNG export capacity of 6.2 MTPA. Responsible for the ISBL scope and development of optimal Design, Execution and Modularization strategies. Reporting to Senior Project Manager. Key Achievements : • Provided Project Leadership to Technip Energies FEED Contractor and 150+ Engineers to deliver timely an accelerated FEED in 12 months. • Applied High density modularization strategy for modules delivery in remote and artic location. Maintained design compliance with complex regulatory requirements. • Led joint modularization and fabrication studies to optimize the sea lift strategy resulting in enhanced logistical efficiency and reduced transport risk. • Developed and implemented a robust Interface Management Program bridging key internal stakeholders and external partners, streamlining documentation exchange and enabling the seamless initiation of site early works.

    • Engineering Manager - Major European Projects
      Oct 2018 - Jun 2020 · 1 yr 9 mos

      Scope : • Gravenchon Gofiner Second Reactor Project. $120M Site strategic Project. Scope strategy was to grow existing site Conversion on integrated Gofiner / FCCU / Gas Oil Hydrofiner chain through cracking and provide better feed quality for downstream units. • Antwerp Light Ends Expansion Project. $60M Project. Scope covered the debottleneck of existing Naphtha Hydrofiner and Crude Light Ends Unit to allow increased light crude, Coker LPG and naphtha processing. Key Achievements : • Provided Project Leadership to Worley’s Netherlands and Belgium EPC Contractors overseeing a workforce of 50+ professionals. • Drove high quality FEED package development with aggressive schedule targets. Effectively monitored and enhanced Engineering Contractor performance while maximizing High Value Engineering Center use (up to 40%). • Led cross-functional team to deliver Turnaround engineering packages on time and meeting site specific expectations • Provided independent technical oversight and strategic guidance to both ExxonMobil and Worley teams, ensuring alignment with high-quality standards. • Served as Advanced Work Phase Champion, guiding teams and fostering seamless execution

  • Consulting at ALTEN
    Feb 2007 - Dec 2007 · 11 mos

    • Management of project portfolio (1 – $20M projects) during all phases of execution, including engineering, contracting, construction, turnaround coordination and commissioning. • All projects implied working within an existing, operating plant environment and required close cooperation and coordination with Operation teams to implement.

  • Engineering Manager at Manoir Industries
    May 2003 - Feb 2007 · 3 yrs 10 mos

    • Engineering Manager overseeing a team of 8 technicians within a manufacturing company specialized in steam-cracking and reforming furnaces. • Scope included technical proposal development, RFQ preparation, detailed engineering design, and optimization of shop fabrication processes."