Switzerland
Civil & Marine Engineer with extensive experience and success overseeing all phases of major infrastructure and energy projects around the globe.
- "Offshore Wind Farm Yunlin" - Taiwan EPCI for Major offshore construction of a 640 MW wind farm generated by 80 Siemens Gamesa SG 8.0-167 DD turbines installed on bottom fixed monopiles foundations at water depths from 7 up to 35 meters in the Taiwan Strait. Client: Yunneng Wind Power consortium (Skyborn Renewables, TotalEnergies, EGCO and Sojitz Corp).
- "North Field Expansion (NFE) Project" - Ras Laffan (QAT) Engineering, procurement, construction & commissioning of 4 new LNG berths marine structures to accommodate Q-Flex & Q-max tankers, including associated causeways, breakwaters and temporary quay wall. - "Dibba Bulk Handling Terminal" - Fujairah (UAE) Engineering, procurement, construction & commissioning of a 800m gravity quay wall at -18m to allow for the simultaneous berthing and operation of 120,000 DWT vessels and assisting tugs. Dredging of the turning basin, access channel, berth pockets and reclamation of 10M m³ fill. Creation and extension of breakwaters. Relocation of a marina and various service facilities. - "WASL Island Development Project" - Dubai (UAE) Construction of a 35 hectares artificial island including dredging, reclamation, rocks works, shore protection, shoring & deep excavation and other civil marine works for future hospitality & leisure developments. - “FMG Tug Harbour Project" - Port Hedland (Australia) Engineering, procurement, construction & commissioning of a nine-pen tug harbour infrastructure and service facilities including fuel, lighting, electrical, water and workshops at Anderson Point.
“Solvay 33" - Brussels (Belgium) Large scale "green" urban renewal project: 40,000m² conversion of the former Solvay offices into luxury apartments, student housing, rest home and retails (low carbon emission and sustainable technologies).
“Dragagem de Manutenção dos Pieres I, II, III e IV do Terminal Marítimo da VALE na Ponta da Madeira" - São Luis (Brazil). Dredging operations executed by means of TSHD's, CSD's and multipurpose pontoons. Capital dredging of Píer 4 (26m depth - 500,000 m³), maintenance dredging of all the Piers owned by mining company VALE (120,000 m³/month).
"Kårehamn Offshore Wind Farm Project" - Baltic Sea - (Sweden) Installation and ballasting of 16 WTGs Gravity Base Foundations and scour protection by means of multipurpose pontoons and rocks dumping vessels.
“Gorgon Project: Rocks Subsea Installation" - Dampier (WA) Trenching and scour protection (1.6 MT) for the 30km offshore pipelines and umbilicals off Barrow island for Chevron Australia Pty Ltd. “Stingray Creek and Hunt Point" - Port Hedland (WA) Dredging and Installation of mooring cyclones facilities in the inner harbour. “Southwest Creek Dredging and Reclamation Project" - Port Hedland (WA) Dredging of 2 shipping berths up to -20m (SP1 & SP2), access channel and turning basin at Stanley Point in the inner harbour estuary (7,000,000 m³). Dredge material disposed offshore or reclaimed and stockpiled into a management area (DMMA G) in order to re-use for future earthworks projects. Construction of a 8 km containment bund (earth dam). “FMG T155 Port Expansion Project" - Port Hedland (WA) Dredging of 1 shipping berth up to -20m (AP4) at Anderson Point in the inner harbour estuary (3,500,000 m³). Dredge material disposed offshore or reclaimed and stockpiled into a management area (DMMA A) for future earthworks projects.