Svein Ivar Rosnes

Well Control Advisor/Project manager at Saga Fjordbase A/S

Stavanger, Rogaland, Norway

About

Drilling Equipment: Mod. 70 Connector H.C. Connector EVO connectors Weight Set Connector B.O.P. Cup testers U/UII -B.O.P. T-B.O.P. TL -B.O.P. Hydril B.O.P. Shaeffer BOP GX annular BOP Boosters D-Annular, Flex Joints, Cameron Drilling Risers Aker Clip riser Vetco diverters BOP Stack Up, function and pressure testing. Various Failsafe valves Platform completion equipment: XMT maintenance. Platform Trees and Wellhead System etc.: Statfjord X.M.T., T.H., W.H. System (Cameron) Snorre T.L.P., X.M.T., T.H., and W.H. System (McEvoy) Heidrun X.M.T., T.H. and Camforge Wellhead System (Cameron FLS) Gullfaks X.M.T. (McEvoy/Cameron) Ula X.M.T., T.H. and W.H. System, various tools (McEvoy) Gyda X.M.T. (Cameron FLS) Draugen X.M.T. (Cameron FLS) Quatar Gas X.M.T. (Cameron) Various: Chokes, manual, pneumatic, hydraulic Various Actuators, HCLR, HLS, AF, MCK, DF, Snorre UPA Subsea equipment incl. controls Tensions Integral Tie-back system Projects: North East Frigg subsea production field. P&A Gulfaks phase 2 extension. Tie in. Snorre UPA Subsea equipment 5 year re-cerification 2002 Rig build Aker Spitsbergen Rig intake COSL Innovator and Promoter.

Experience

  • Well Control Advisor/Project manager at Saga Fjordbase A/S
    Jul 2015 - Present · 11 yrs

    5 year re-certification of Snorre UPA workover equipment.

  • Owner at SIR Subsea AS
    Aug 2011 - Present · 14 yrs 11 mos

    Advisor in subsea drilling, completion, tie-in and LWI

  • Well Control Advisor at Statoil
    Aug 2011 - Jun 2015 · 3 yrs 11 mos

    New build follow up on subsea well control drilling equipment. 3rd party representative for recert process of well control equipment.

  • Senior Subsea Engineer at Aker Drilling
    May 2007 - Jul 2011 · 4 yrs 3 mos

  • Senior service engineer at Cameron
    Oct 1991 - Jun 2006 · 14 yrs 9 mos