Shift boss overseeing construction of crosspassage between 2 TBM tunnels using both frozen ground and dewatering for excavation in challenging ground conditions.
Working with Newcrest mining on behalf of Rorcon Ltd advising on site team on tunneling methods in poor ground conditions with water ingress for large SCL drift.
Night shift foreman managing tunnel teams and multiple sub contractors for connection of new station platform to existing Northern line running tunnel with the constructing of two new Scl tunnels, formwork and rail installation.
Various diameter shaftsranging from 10 meter to 22 meter at depths of 40 to 55 meters. Construction of various size scl tunnels and tie in to Tbm tunnels. Installation of pipe canopy’s in unstable ground. Secondary lining and and cast in tunnel eyes. On this project my tunneling team received award for best delivered scl package on Thames tideway and was delivered months ahead of schedule.