Florence, Tuscany, Italy
PROFILE Serving the On-Shore and Off-Shore Oil & Gas Industry for more than 40 years, with an experience ranging from Rotating Equipment installation & Start-up to Site Project Management of multi million dollars Projects, with verifiable track record of successful accomplished tasks. Strength, professionalism and devotion to all assigned tasks have been demonstrated during the past years while serving major EPC Companies such as Tecnicas Reunidas, Saipem and Tecnimont in Construction Project Management positions, as well as Commercial and Execution Leadership for GE Oil & Gas – Nuovo Pignone. SKILLS Solid Integrity Fundaments Cross-functional Team Leadership, Time Management, Autonomous Hard Worker, Interpersonal and Communication Skill at every level, Team Player, Creative thinking and Organizational skills, Decision Making, Negotiating and Diplomacy skills, Result Oriented, Perseverance, Decisiveness and Customer-centric approach to accomplish the needs of various Clients,
The project consists in the assembly of 40 (forty) modules of medium / small size, for 5 MEG Regeneration Trains, where each Train consists of 8 (eight) modules, the transportation and erection of said modules inside the ENI / Petrobel ZOHR Plant, plus the installation / erection of loose structures / air coolers / columns / various equipment / piping etc Off-Modules. The main criticality is the fast track, where the first two complete Trains of first phase have been delivered by December 2022, and the other three Trains of second phase will be delivered by August / September 2023
Relocated at beginning of December 2021 in Malaysia in the position of Senior Construction Manager for the completion of the ongoing project named DHT Rebuild Project, for the Client PETRONAS in the RAPID Refinery, state of Johor. The project was in its construction completion stage, and my duty was to bring timely and safely to the commissioning and start-up, scheduled for the months of May 2022.
January 2019 To October 2022 Construction Area Manager (Saudi Arabia) Project Name: Hawiyah and Haradh gas Compression Project Total Project Contract Value: 2,4 B$ Type of Contract: EPCC, LSTK basis. Client: SAUDI ARAMCO Relocated at the beginning of January 2019 in Saudi Arabia in the position of Construction Area Manager - Package 1 - North of the newly started project, located 300 Km South West from Dammam, which comprises 9 Gas Compression Plant, with a total of 17 Compression Units, spanned in a radius of 140 Km, in three different Areas, as better described here below PACKAGE 1 – NORTH: NGCP No. 3 Gs Compression Plants No. 1 Liquid Separation Station No. 1 Administration Area PACKAGE 2 – SATELLITE: SaGCP No. 3 Gs Compression Plants No. 4 Liquid Separation Station PACKAGE 3 – SOUTH: SGCP No. 3 Gs Compression Plants No. 1 Liquid Separation Station No. 1 Administration Area
Project Name: Al-ZOUR Refinery Project Total Project Contract Value: 4,3 B$ (Consortium between TR, Sinopec & Hanwha) Type of Contract: EPCC, LSTK basis. Client: KNPC / KIPIC Sub-Contractors involved at the present date (June 2017) • Ahmadiah for Civil Works • Combained Group for Civil Works • CMBC for Structural Works • NSH for Mechanical, Piping and E&I Works Responsible for the Construction activities of the Area 4, which comprise nine different Hydrotreater Units, engineered by the Consortium Partners, as better described here below: ➢ Diesel Hydrotreater Units (3 Units in Total) ➢ Nafta Hydrotreater Units (2 Units in Total) ➢ Kerosene Hydrotreater Units (2 Units in Total) ➢ Heavy Oil Cooling Unit ➢ Saturated Gas Plant Unit Al-Zour Refinery is a grass roots new refinery located in the Al-Zour Area, south of Kuwait city and with its total capacity of more than 600.000 bpd production capacity, is one of the largest oil refining plants worldwide
Accepted Technicas Reunidas challange for the Site Management of the TOUAT GAZ PROJECT, located in the SBAA Bacin, Adrar Región, Algeria. Dealing directly with the Client, a Consortium made between GAZ DE FRANCE and SONATRACH, and reporting directly to the Project Director based in Madrid, the main task and responsibilities given by Top Management were primarily focused on boosting the progress of the construction works, achieving and improving targets set for by the construction project schedule, maintaining HSE and Quality at highest level in accordance with Técnicas Reunidas standards.
Relocated on emergency basis to Kuwait and assigned to the KOC (Kuwait Oil Company) Project named “NEW BOOSTER STATION BS-171 AT WEST KUWAIT”, in the position of Site Manager – Plant, reporting directly to the Project Director located in Kuwait. The “New Booster Station BS-171 at West Kuwait” is comprised of the following Facilities: -BS-171 Plant. -ISC Intermediate Slug Catcher, located about 80 Km from the Plant. -GC17 & GC27 Gathering Centers, located at about 30 km south of the Plant. -GC16 and GC28 Gathering Centers, located at about 8 km north of the Plant. -Various gas / condensate Pipelines connecting BS-171 Plant with ISC and GCs (managed by a dedicate Site Organization)
Relocated in Salamanca – GTO- (Mexico) and assigned to the PEMEX projects named GUBA (Gasolina Ultra Bajo Azufre) and consisting in the “DESARROLLO DE LA INGEGNERIA, PROCURA Y CONSTRUCCION DE LAS PLANTAS DESULFURADORAS DE GASOLINA CATALITICA, UNIDADES REGENERADORAS DE AMINA, INSTALACIONES COMPLEMENTARIAS, INSTALACIONES DE SERVICIOS AUXILIARES Y SU INTEGRACION EN LAS REFINERIAS MIGUEL HIDALGO EN TULA DE ALLENDE, HGO Y ING. ANTONIO M. AMOR EN SALAMANCA, GTO” in the position of Project Construction Manager for the revamping / expansion of both refineries (Tula and Salamanca) and the local prefabrication shop for piping and structures located in Queretaro, QTO. Reporting directly to the Project Director based in D.F.
Relocated in Shah (UAE) and assigned to the project named SHAH GAS DEVELOPMENT PROGRAM (SGD) in the position of Site Manager for the PKG-2 EAST Gas Treatment Units and all Non Process Buildings for the PKG-2 (EAST, CENTRAL & WEST Gas Treatment Units) and PKG-3 (Sulfur Recovery Units). The PKG-2 EAST Gas Treatment Units comprised of four Units as below: • Unit 726 Condensate Hydro-treater / Hydrogen Plant • Unit 727 Condensate Hydro-treater / Hydrogen Plant (twin Unit) • Unit 740 Residue Gas Compression • Unit 742 Gas Dehydration / Refrigeration / NGL Recovery / Regeneration The Non Process Buildings comprised of 24 Buildings for all Process Units on PKG-2 and PKG-3, as below: • PKG-2, No. 16 Buildings (12 Substation and 4 Control Rooms) • PKG-3, No. 8 Buildings ( 5 Substation and 3 Control Rooms) I was reporting directly to the Operation Manager based in Abu Dhabi and cooperating / coordinating the various activities with the Site Manager of PKG-2 CENTRAL and WEST and the Site Manager of PKG-3.
Relocated in Fortaleza, Ceara (Brazil) at the end of 2008 in the leadership position of Construction Manager (CSM) for the Coal Power Plant of UTE Pecem, consisting in three power units of 360 MW (each one made of steam boiler, steam turbine generator and desulphurization unit), Utilities and Facilities. Reporting directly to the Site Manager, and acting as Deputy S.M. in the latter’s absence.