Network Rail DPE & SPE for major projects Nationwide.
Signalling SPE Western IP, for Paddington and Old Oak Common area on Crossrail enabling works, Also covering : HS2 Station, Hs2 Enabling, Bourne End Capacity Improvement and Old Oak Common Decommissioning with 6.6kv Essential works.
Signalling Management Consultancy
Engineering manager and CEM for Atkins on Sutton and Wimbledon grip 4 and Streatham grip 5 and 6
The project - Line Speed with Tonnage & Gauge improvements to the Doncaster to Peterborough route via Lincoln, Full modular Re-Signalling and major civils engineering works. Heading up the GNGE Team as Principal CEM for Design and Construction. 7 Principal CRE's and 4 Phase CEM's for the project are direct reports. The project life expected to December 2014 - 14 December 2014 69th blockade day on GNGE within twelve months. Don't want to jinx this weekend's work but by the morning we'll have delivered 25km of earthworks, 38 new bridges, 75km fencing, 56 ends of new S&C, 83km of track renewals, 70km re-railing, 35 new level crossings, not to mention 90 miles of re-signalling! Next?
CEM Phase 5, Peterborough Werrington Jcn to Spalding.