Hong Kong SAR
Learn new technologies quickly, have a strong thirst for knowledge and research ability; be honest, cheerful, progressive, serious and practical; have a strong sense of responsibility; have excellent learning ability and are willing to learn; dare to innovate and constantly strive for excellence; can bear hardships and stand hard work , Can quickly adapt to various environments and integrate them; have a strong teamwork spirit, professionalism and strong organization and coordination ability; dare to accept difficulties and challenges.
Site Experience - Proposed Commercial Development at KIL11237, Junction of Sai Yee Street and Argyle Street, Mong Kok, Kowloon Engineering supports for temporary works fabrication and inspection Temporary works design included calculation, model simulation and drawings Monitoring record preparation Engineering supports for socket h-pile fabrication and inspection - Property Development above LRT Terminus, TSWTL 23, Area 33, Tin Shui Wai, N.T. Engineering supports for rebar fixing progress of R.C. structural elements Temporary works design included calculation and drawings Engineering supports for pressure grouts of R.C. columns and walls Engineering supports for pre-load of ELS Engineering supports for demolition of steel king posts Issue the works orders to QS Engineering supports for Concrete condition Consent-to-Work briefing meeting holding for works near Light Rail Technical coordination and submission for tests (Proof load test of anchor, welding etc) Heat Soak test inspection
Design Experience - Project Engineer of Proposed Residential Development at 15-17 & 19-21, Valley Road, Ho Man Tin, Kowloon The proposed development is a 25-storey R.C. building The tower is a traditional slab-beam-column-shear wall structural frame that the loading is transferred by a transfer plate at 2/F BD submission of superstructure, structural drainage, pile cap and socket H-pile Participate the site meeting, project meeting, RFI meeting, BIM coordinate workshop with multi-parties Assessed the method statement, material submission and shop drawings from contractor Reply the RFI & RFC from contractor Submit the relevant documents under the condition of approval letter - Project Engineer of Proposed Temporary Residential Development (Transitional Housing) at the Junction of Yau Ma Hom Road & Cheung Wing Road, Tsuen Wan, New Territories The proposed development is a 4-storey steel MiC building The connection of adjacent MiC module included steel plate, welding, bolt and nut The R.C. MiC building are self-standing, the lateral loads are transfer through steel plate to transfer to other MiC units and finally transfer to foundation - Project Engineer of Typical BoxPod MiC Module for Inclusion in the BD’s MiC List of Pre-acceptance (Application of IPA of MiC) Wind design under COP on Wind Effects in Hong Kong 2019 R.C. MiC are self-standing The connection between MiC module included steel plate, welding, bolt and nut - Wind load estimation of R.C. Superstructure for Proposed Comprehensive Residential Development at NKIL No. 6631 Cheung Sha Wan, KLN Wind design under COP on Wind Effects in Hong Kong 2019 Since 6 Towers on a single Podium, assessment of 8 checking directions under the global axis and critical torsional load cases shall be done - Design of Hoarding for Proposed development of new academic building for the Hang Seng University of HK
Site Experience - RGBC TCP T1 for A&A Works (Erect signboard at Terminal 8) - Resident Engineer of Hoarding and Demolition Works for Proposed Residential Redevelopment at 1-9 Eastern Street Design Experience (Included report, calculation, Forms, design drawings preparation) - Poadesign Tale’s Cairn Tunnel (Check the structural adequacy of existing steel members) - Extent signboard at Great Eagle (A&A) - Design of Footing design of challenging tower (A&A) - Design of Transformer room & Switch room at Tsing Ko Road - MTR Tai Wai Station (Design parapet wall) - Minor Works Design of Window - Minor Works Design of Steel Frame of Solar Panel - Design of temporary canopy, tent, marquee for Disney - TPPE-2018 Clockenflap – Zone 3 (Temporary structure design)
Site Experience MA ON SHAN DEVELOPMENT – ROADS, DRAINAGE AND SEWERAGE WORKS AT WHITEHEAD AND LOK WO SHA, PHASE 2 - Construction of covered footbridge with lift core and staircase - Construction of a new sewage pumping station and retaining wall - Planed the method statement of demolition works of existing retaining wall - Design the formwork patterns of R.C. structure - Prepared material Submission under specification requirement - Coordination with multi-parties - Prepared environmental reports - Coordinate with CLP inspector for the Transformer room at the sewage pumping station.