Sheung Chi CHUNG

Structural Engineer

Hong Kong SAR

About

Learn new technologies quickly, have a strong thirst for knowledge and research ability; be honest, cheerful, progressive, serious and practical; have a strong sense of responsibility; have excellent learning ability and are willing to learn; dare to innovate and constantly strive for excellence; can bear hardships and stand hard work , Can quickly adapt to various environments and integrate them; have a strong teamwork spirit, professionalism and strong organization and coordination ability; dare to accept difficulties and challenges.

Experience

  • Engineer II at SANFIELD (MANAGEMENT) LIMITED
    Jul 2023 - Mar 2026 · 2 yrs 9 mos

    Site Experience - Proposed Commercial Development at KIL11237, Junction of Sai Yee Street and Argyle Street, Mong Kok, Kowloon  Engineering supports for temporary works fabrication and inspection  Temporary works design included calculation, model simulation and drawings  Monitoring record preparation  Engineering supports for socket h-pile fabrication and inspection - Property Development above LRT Terminus, TSWTL 23, Area 33, Tin Shui Wai, N.T.  Engineering supports for rebar fixing progress of R.C. structural elements  Temporary works design included calculation and drawings  Engineering supports for pressure grouts of R.C. columns and walls  Engineering supports for pre-load of ELS  Engineering supports for demolition of steel king posts  Issue the works orders to QS  Engineering supports for Concrete condition  Consent-to-Work briefing meeting holding for works near Light Rail  Technical coordination and submission for tests (Proof load test of anchor, welding etc)  Heat Soak test inspection

  • Structural Engineer at WONG & CHENG CONSULTING ENGINEERS LIMITED
    Mar 2021 - Jul 2023 · 2 yrs 5 mos

    Design Experience - Project Engineer of Proposed Residential Development at 15-17 & 19-21, Valley Road, Ho Man Tin, Kowloon  The proposed development is a 25-storey R.C. building  The tower is a traditional slab-beam-column-shear wall structural frame that the loading is transferred by a transfer plate at 2/F  BD submission of superstructure, structural drainage, pile cap and socket H-pile  Participate the site meeting, project meeting, RFI meeting, BIM coordinate workshop with multi-parties  Assessed the method statement, material submission and shop drawings from contractor  Reply the RFI & RFC from contractor  Submit the relevant documents under the condition of approval letter - Project Engineer of Proposed Temporary Residential Development (Transitional Housing) at the Junction of Yau Ma Hom Road & Cheung Wing Road, Tsuen Wan, New Territories  The proposed development is a 4-storey steel MiC building  The connection of adjacent MiC module included steel plate, welding, bolt and nut  The R.C. MiC building are self-standing, the lateral loads are transfer through steel plate to transfer to other MiC units and finally transfer to foundation - Project Engineer of Typical BoxPod MiC Module for Inclusion in the BD’s MiC List of Pre-acceptance (Application of IPA of MiC)  Wind design under COP on Wind Effects in Hong Kong 2019  R.C. MiC are self-standing  The connection between MiC module included steel plate, welding, bolt and nut - Wind load estimation of R.C. Superstructure for Proposed Comprehensive Residential Development at NKIL No. 6631 Cheung Sha Wan, KLN  Wind design under COP on Wind Effects in Hong Kong 2019  Since 6 Towers on a single Podium, assessment of 8 checking directions under the global axis and critical torsional load cases shall be done - Design of Hoarding for Proposed development of new academic building for the Hang Seng University of HK

  • Assistant Engineer at PETROS CONSULTING ENGINEERS LIMITED
    May 2018 - Nov 2020 · 2 yrs 7 mos

    Site Experience - RGBC TCP T1 for A&A Works (Erect signboard at Terminal 8) - Resident Engineer of Hoarding and Demolition Works for Proposed Residential Redevelopment at 1-9 Eastern Street Design Experience (Included report, calculation, Forms, design drawings preparation) - Poadesign Tale’s Cairn Tunnel (Check the structural adequacy of existing steel members) - Extent signboard at Great Eagle (A&A) - Design of Footing design of challenging tower (A&A) - Design of Transformer room & Switch room at Tsing Ko Road - MTR Tai Wai Station (Design parapet wall) - Minor Works Design of Window - Minor Works Design of Steel Frame of Solar Panel - Design of temporary canopy, tent, marquee for Disney - TPPE-2018 Clockenflap – Zone 3 (Temporary structure design)

  • Civil Engineering Graduate at Top Express Construction Engineering Limited
    Oct 2016 - Jan 2018 · 1 yr 4 mos

    Site Experience MA ON SHAN DEVELOPMENT – ROADS, DRAINAGE AND SEWERAGE WORKS AT WHITEHEAD AND LOK WO SHA, PHASE 2 - Construction of covered footbridge with lift core and staircase - Construction of a new sewage pumping station and retaining wall - Planed the method statement of demolition works of existing retaining wall - Design the formwork patterns of R.C. structure - Prepared material Submission under specification requirement - Coordination with multi-parties - Prepared environmental reports - Coordinate with CLP inspector for the Transformer room at the sewage pumping station.