Konya, Türkiye
Strong professional experience with more than 10 years of experience in the areas of Health, Safety, Environment management and team management for road project, potable water treatment plants and transmission pipeline project, waste water treatment project, industry project, international gas fired power plant, lignite thermal power plant and dam project. Build and supervise HSE organizations for worldwide construction projects Prepare HSE training materials; preparation of risk assessment and method statement for construction. Experienced in managing projects worldwide by leading HSE teams
Hava Platformunda Uzaktan ED/ET Kabiliyeti (HAVA SOJ) Projesi Hangar ve Filo Binası Yapım İşi
Unilever HPC Factory
Project: Tokat - Niksar Road Client: Republic of Turkey General Directorate of Highways (KGM) Main Contractor: Doğuş İnşaat ve Ticaret A.Ş & Yda İnşaat Location: Tokat / TURKEY Total Length of the Road: 49 km, 2 x 2 Lane
Project: Mavi Tunel Potable Water Treatment Plants and Transmission Pipeline Project Client: General Directorate of State Hydraulic Works (DSİ) Main Contractor: Doğuş İnşaat ve Ticaret A.Ş Location: Konya / TURKEY
Project: Afyon Alkaloids Factory Water Treatment Plant Project Client: General Directorate of Turkish Grain Board (TMO) Main Contractor: Doğuş İnşaat ve Ticaret A.Ş Location: Bolvadin / Afyonkarahisar / TURKEY Project Capacity: 840 m³/day Afyon Alkaloids Factory water treatment plant project involves the construction of a treatment plant including physical treatment, biological treatment (anoxic tank, aerobic tank, membrane bioreactor, evaporation and crystalization), sludge treatment (sludge dewatering, thermal sludge drying) and one year of operation.
1. Baymina Energy Ankara CCGT Power Plant 2. Ak Energy Erzin CCGT Power Plant 3. Doga Energy Esenyurt Thermal Power Plant Gas Turbines and Steam Turbine Maintenance Work Periodical / Project Based Working Company: Wellpoint Platform OSGB
Vector HPC Plant is being constructed in Konya. Project : Vector HPC Plant Project (Gebze HPC Plant relocation) Client : Unilever Sanayi ve Ticaret Türk A.Ş. Consultant : Entegre Proje Yönetim Danışmanlık Mühendislik Tic. A.Ş. Main Contractor : Karsan & Aksa Joint Venture Project Total Budget : 240 Million € Project Peak Employee : 1500 Hse Department : Wellpoint Health, Safety & Environmental