Sarah Taylor

Head of Environment and Social Governance (ESG)

Woking, England, United Kingdom

About

A highly experienced and forward-thinking professional with a unique blend of expertise in NHS sustainability leadership, ESG strategy, construction delivery, and project management across healthcare, retail, education, digital, manufacturing, pharmaceuticals, and the built environment. As Head of Sustainability for both an NHS Trust and Integrated Care Board (ICB), I bring strategic and operational insight into how organisations can drive environmental and social transformation while balancing commercial and clinical priorities. Alongside my professional role, I also serve with St John Ambulance as a qualified Emergency Responder (FREC3), where I am trained to make rapid, high-pressure decisions in complex, often life-threatening scenarios. This frontline experience reinforces my ability to remain calm under pressure, assess risk swiftly, and act decisively—skills which translate directly into senior-level project and leadership environments. My work within the NHS and wider sectors has focused on applying environmental, social and health (ESH) principles in practical ways that drive behaviour change, improve long-term value, and meet both national targets and local needs. I understand that ESG performance must be commercially viable, and I actively align sustainability innovation with cost efficiency, risk reduction, and measurable return on investment. With extensive experience in project management, cost consultancy, design coordination, planning, procurement, and life cycle costing, I’ve led projects across NHS infrastructure, heritage conservation, secure facilities, commercial developments, and major public-sector programmes. I bring deep knowledge from both client-side consultancy and contractor roles, with a strong appreciation for communication, governance, and stakeholder expectations at every level. Known for my commercial awareness, strategic thinking, and resilient leadership, I am a proactive professional who thrives in complex environments and is driven by the desire to create long-lasting, high-impact change through collaboration and innovation.

Experience

  • Estates Net Zero Regional Delivery Group Coordinator at NHS England
    Oct 2022 - Present · 3 yrs 10 mos

    Supporting regional implementation of the NHS Estates Net Zero Carbon Delivery Plan, focusing on innovation in estates design, decarbonisation, and sustainable infrastructure delivery. Key Responsibilities: Coordinated quarterly regional delivery group meetings to support alignment and acceleration of decarbonisation strategies across NHS estates. Identified opportunities for infrastructure improvements that support energy efficiency, low-carbon technologies, and water/waste reduction. Advocated for sustainable construction and design methods that eliminate waste and pollution at source, promoting circular economy principles. Facilitated regional access to national estates sustainability resources and tools to support Trusts in achieving NZC compliance. Maintained a shared regional forum for estates professionals to exchange best practices, lessons learned, and emerging innovations. Assisted with performance monitoring and data reporting on Scope 1–3 emissions, supporting evidence-based investment decisions. Collaborated with sustainability teams and senior estates leaders to review progress against delivery plan milestones and develop future workstreams.

  • Frimley Health NHS Foundation Trust (5 yrs)
    • Head of ESG (Enviromental and Social Governance) including Sustainability
      Nov 2021 - Present · 4 yrs 9 mos

      Providing strategic leadership & expert guidance on the delivery of the Net Zero & wider ESG agenda across Frimley Health & the ICS, ensuring system-wide integration of ESG principles into operations, care delivery & infrastructure. Key Responsibilities: Led the development & implementation of the Green Plans for FHFT & the ICS, aligning with national Net Zero targets & regulatory frameworks, while identifying opportunities to exceed national timelines & ambitions. Acted as the lead specialist on ESG, advising executives, boards & system partners on ESG performance, risks & opportunities. Provided Board-level assurance on compliance with statutory & regulatory requirements, supporting transparent reporting of ESG performance against NHS targets & ICS Green Plans. Supported executive leads, service managers & clinical teams in embedding ESG into day-to-day decision-making by providing tailored tools, training & monitoring frameworks. Maintained a high-profile presence for the Trust & ICS on regional & national ESG platforms, representing the system in cross-sector partnerships & innovation programmes. Championed initiatives that deliver improved health outcomes, patient care quality, financial resilience & social value through strong ESG practices. Key Achievements: Secured £6 million in government funding from Great British Energy (GBE) to install solar panels & energy storage systems across Frimley Park Hospital, Wexham Park Hospital & Heatherwood Hospital — cutting carbon emissions & reducing long-term energy costs. Obtained £5.2 million, the second-highest award in the country, to complete full LED lighting replacement internally & externally at Frimley & Wexham sites, including Building Management System (BMS) upgrades & rollout of SMART Theatres across 36 theatres. Delivered strategic business cases, ESG metrics & investment plans that enabled accelerated delivery of infrastructure decarbonisation & digital energy management across the ICS.

    • Estates Transformation Manager
      Aug 2021 - Apr 2025 · 3 yrs 9 mos

      Led implementation of the Estates Transformation Programme, reporting to the Head of Estates & Estates Steering Group. Delivered key infrastructure & operational change aligned with clinical transformation, ensuring timely mobilisation, digital integration, risk management & regulatory compliance. Key responsibilities included: Coordinating programme delivery & reporting progress to senior estates leadership. Working with stakeholders to manage the impact of estate changes across clinical, operational & facilities teams. Liaising with Digital Services to specify, authorise & support digital systems required for mobile estates working. Supporting the successful rollout of the EPIC electronic patient record (EPR) system, ensuring estates readiness & infrastructure alignment. Collaborating with Procurement to develop & tender specialist maintenance contracts or incorporate into existing frameworks. Mobilising estates & hard FM services for the new hospital, ensuring alignment with clinical & digital transformation pathways. Leading warranty defect tracking, contractor engagement & post-handover financial governance. Major Projects: Decommissioning Old Heatherwood Hospital: Oversaw safe shutdown of engineering systems, utility disconnections, isolation of medical gas systems, removal of hazardous materials, temporary boilers, oil tanks & surplus equipment. Managed supplier liaison & coordinated asset disposal. New Heatherwood Hospital Mobilisation: Served as Silver Command during the hospital opening. Supported TOC duties, estates integration & digital system mobilisation, including EPIC & SMART FM systems. Successfully delivered complex estates transformation during high-profile service transition, ensuring safety, compliance, digital readiness & continuity of patient care.

  • Document Controller at Henry Construction Projects Limited
    May 2021 - Aug 2021 · 4 mos

    A pivotal role providing comprehensive administrative, planning & communication support to project delivery teams, ensuring smooth coordination between stakeholders, contractors, consultants & the client team. Key Responsibilities: Managed document control systems, filing, & record-keeping to maintain compliance & traceability across all project stages. Handled applications for permits from local authorities & managed utilities coordination in support of site operations. Produced & compiled essential site documentation, including handover packs, health & safety files & operations manuals. Provided day-to-day administrative support from head office & directly to site teams, including ordering equipment & ensuring office resources were in place. Maintained & updated project plans, tracked milestones, & assisted in the preparation of business-wide communications. Supported multiple department heads, liaising across teams to ensure timely completion of tasks & seamless operations. Acted as CCS (Considerate Constructors Scheme) Coordinator, ensuring compliance with standards & site presentation, including public information boards. Coordinated defect tracking & resolution processes during and after construction. Assisted with planning activities & supported BREEAM compliance processes, including documentation & performance evidence gathering. Built strong working relationships with designers, consultants, the Client Team & End Users, ensuring clear communication & expectations management. Represented the project team in public relations activities, supporting the visibility & reputation of the scheme. Skills & Tools: Highly organised, proactive & self-motivated. Proficient in Microsoft Office (including Excel), 4Projects, & EdControls.

  • Executive Quantity Surveyor at Gleeds
    May 2016 - Mar 2019 · 2 yrs 11 mos

    Commercial lead on high-value, complex developments delivering full cost & contract management across the project lifecycle. Experienced with NEC3/4 ECC & JCT (D&B, Intermediate), aligned with RICS competencies including Cost Planning, Procurement & Tendering, Contract Practice, Risk Management & Client Care. Key Projects: K1, Knightsbridge (340,000 sqft): Mixed-use scheme with world-class retail, 66,000 sqft Grade A offices, luxury apartments, basement & rooftop restaurant. Led NEC/JCT contract administration, procurement, LUL interface, highways coordination & demolition. Managed change control, commercial risk, & contract delivery across multi-phase construction. Parliament’s Northern Estate (Westminster): NEC-based cost & procurement lead for restoring Norman Shaw North/South, 1 Parliament St & Derby Gate. Oversaw financial design management, stakeholder coordination & value engineering, supporting temporary MP relocation. Managed Tube line interface, heritage constraints & future-use strategy. Central London 5-Star Hotel (Over Tube): Provided early-stage cost planning, contract strategy & procurement. Managed change control, acoustic treatment & load management over LUL infrastructure, aligned with brand & planning expectations. High-End Residential (Executive Surveyor): Brought in to recover a stalled luxury home build. Led contractor negotiation, cash flow realignment & cost governance. Residential Towers & Church Development: Managed JCT contract administration for twin towers, new church, landscaping & adjacent LA-owned zones. Resolved below-ground asset conflicts & planning matters. Core Skills: Cost Planning | NEC3/4 | JCT | Procurement | Risk Management | Change Control | Stakeholder Management | TfL/LUL Interface | Historic Buildings | Hospitality & Residential | Commercial Governance | Value Engineering

  • Senior Quantity Surveyor at WT Partnership (UK & Europe)
    Mar 2014 - Apr 2016 · 2 yrs 2 mos

    Experienced QS overseeing cost planning, procurement, contract management & delivery strategy across complex developments including major urban extensions, hotel & leisure schemes, transport-linked infrastructure, and high-end residential. Key Projects & Responsibilities: Houghton Regis North (HRN): Led the development of a site-wide commercial strategy for a 5,150-home masterplan, including 1 million sq ft of commercial (warehousing, retail, leisure & office), community facilities, three primary schools, 78 hectares of open space, orchards & parkland. Oversaw infrastructure planning linked to A5-M1 link, Junction 11A & Woodside Link Road. Hotel & Leisure Sector (UK-wide): Delivered cost planning, tendering & commercial control on multiple hotel schemes: Mandarin Oriental, London (refurbishment) Arundel Grey Court, London – mixed-use high-end apartments & luxury hotel New builds: 80–330-bed hotels in Manchester, Greenwich, Egham, Farnborough & Crawley Leisure schemes: 8-screen cinema complexes in Ely & St Neots Urban & Infrastructure Projects: Elephant & Castle mixed-use scheme – demolition, enabling & new build Battersea river wall refurbishment – heritage infrastructure Vauxhall City Farm, London – affordable housing & agricultural buildings Major urban extension (5,000+ homes, 2 million+ sq ft commercial, schools, roads) Specialist Reports & Planning: Dilapidations report – 350-bed hotel, Heathrow Marina development – cost plan for new marina with hotel, residential & retail Competencies: Cost Planning | Contract Administration (JCT/NEC) | Procurement | Master planning | Infrastructure | Stakeholder Engagement | Urban Regeneration | Hotel & Leisure | Community Facilities | Risk & Value Management | RICS-aligned Practice