Mr. Sanders is currently the Country Manager – Development Assistance Projects in Vietnam where he is accountable for managing all business operations including oversight of $2.3 billion in donor funded projects and 350 employees including subconsultants. The projects are in the transportation, water, wastewater Mr Sanders is also a seasoned senior project manager/estimator with over 23 years of experience in the field of construction specializing in civil construction, waste water/water treatment and environmental remediation.

Experience

  • CDM Smith (16 yrs 3 mos)
    • Vietnam Country Manager-Development Assistance Projects
      Jul 2016 - Present · 10 yrs 5 mos

    • Vietnam
      Present

      Mr. Sanders is currently the Country Manager in Vietnam where he is accountable for managing $2.3 billion in donor funded projects and 350 employees including subconsultants. Current projects in Vietnam: Bac Kan - Transport Connections in Northern Mountainous Provinces Project (ADB) Service Provided: Design Review; Pre-Construction Assistance Contract Total Value (expected on completion): $4,400,000 Vietnam Urban Upgrade Project - Ho Chi Minh City - Improving canal and roads - Tan Hoa Lo Gom Canal (World Bank) Service Provided: Construction Supervision Contract Total Value (expected on completion): $5,200,000 Central Region Rural Water Supply and Sanitation Sector Project (ADB) Service Provided: Project Management, O&M and Monitoring and Evaluation Contract Total Value (expected on completion): $5,200,000 Ho Chi Minh City Urban Mass Rapid Transit Project (ADB) Service Provided: Administration of Design and Bidding Process; Construction Supervision Contract Total Value (expected on completion): $4,700,000 Hai Phong Urban Transportation Development Project (World Bank) Service Provided: Construction Supervision Contract Total Value (expected on completion): $3,442,714 and VND 71,875,170,041 Central Mekong Delta Region Connectivity Technical Assistance – Cao Lanh Bridge Project (ADB and DFAT) Service Provided: Design, Bidding and Construction Supervision Contract Total Value (expected on completion): $11,810,688 Ho Chi Minh City Water Supply Project (ADB) Service Provided: Design, Bidding and Construction Supervision Contract Total Value (expected on completion): $4,505,200 and VND 69,030,720,000 Da Nang - Quang Ngai Expressway Construction Project (World Bank) Service Provided: Construction Supervision Contract Total Value (expected on completion): $11,637,946 and VND 98,647,298,946 Da Nang Sustainable City Development Project (World Bank) Service Provided: Construction Supervision Contract Total Value (expected on completion): $2,750,000

    • Vietnam Country Manager
      Jul 2016 - Present · 10 yrs 5 mos

    • Vietnam
      Present

      Mr. Sanders is responsible for all business operations (HR, Contracts, Closeout, Finance etc.) and profitability. Mr. Sanders is managing all ongoing activities, such as: financial, human resource, contract closeout administration, technical and quality project auditing. He leads the team to gain below success: • Improved project monitoring from the core operations team; • Reduced revenue exposure by chasing and collect accounts receivable; • Improved Client relationships; • Provided strong support and speedy responses to project issues; • Reduce financial risks by accelerating amortization of advance payments and reduction of bank guarantees; • Performed face to face Technical and Quality Audits on projects; • Addressed and reduced outstanding labor issues; • Continuous improvement with corporate and regulatory compliance; • Development of suitable operation guidelines; • Continue developing databases and document control of all Contracts, Human Resource and Financial information; • Review subcontract agreements and addressed any contractual issues with sub consultants and JV partners; • Implementation of corporate anti-corruption policy (ACP) training for all staff, sub consultants and JV partners alike.

    • Project Chief of Party
      Jun 2012 - Jun 2016 · 4 yrs 1 mo

      Chief of Party, Danang, Vietnam Airport Dioxin Remediation Construction Oversight and Capacity Building Mr. Sanders served as the Chief of Party on this $13,000,000 project in Danang Vietnam from June 2012 to June 2016. The Da Nang Airport is referred to as a dioxin “hot spot” due to the high levels of dioxin in the soils and sediments decades after large amounts of Agent Orange were stored and handled there during the Vietnam War. The Environmental Remediation at Da Nang Airport Project is one of the highest priority USG activities in Vietnam. The Project furthers a number of high-level U.S. foreign policy objectives, including: resolving a war legacy issue, promoting economic growth, and improving environmental and health conditions and is also among USAID’s most technically complex environmental compliance activities. The project consisted of excavating up to 160,000 M3 of dioxin contaminated soil, sampling, sediment excavation, constructing an in pile thermal treatment system, thermally treating the soil, and capacity building activities.

    • Estimator
      Sep 2010 - Sep 2012 · 2 yrs 1 mo

      Estimator, Clean Potable Water System Mr. Sanders served for the project lasting from September 2010 to September 2012. USACE selected CDM Smith under the design-build contract mechanism to construct a potable water system at the Dugway Proving Grounds in Dugway, Utah. The project will occur at six different sites (Defense Test Chamber, Laser Facility, Avery, Baker, Carr, and Ditto) that are a significant distance apart. The purpose of this project is to provide the military base an improved potable water system that meets or exceeds current regulations, standards, codes, and requirement to treat 100 percent of the water. The work included installation of two water treatment plants, water transmission and distribution pipelines service connections, auto flush valves, RF meters – backflow preventers, replacement of defective and installation of new fire hydrants, electrical, control systems, new pump systems, a new buildings to house the water treatment systems, treated water tanks, and installation of fiber optic cable. The project also included two RO treatment systems, treated water tanks, and buildings, with approximately 100,000 lf of water transmission and distribution pipelines for domestic and fire service to reduce taste and odor issues, minimize leakage, and replace corroded lines. The redundant Reverse Osmosis (RO) systems will achieve all secondary water quality standards including total dissolved solids.The replacement of the deteriorated piping in the distribution system is intended to reduce the loss of water from leaks and reduce pressure loss in the system associated with existing corrosion of the pipe surfaces. The new potable water distribution piping will also reduce the deterioration in water quality that results from bacteria harbored and supported by the corroded surfaces and by-products. CDM Smith also designed and programmed a new SCADA network for two water treatment facilities.

    • Project Construction Manager, General Contractor
      Apr 2011 - May 2012 · 1 yr 2 mos

      Project Construction Manager, General Contractor/Construction Manager Services, Windermere CSO Reduction Project Construction Oversight and Capacity Building Mr. Sanders is serving as the Construction Project Manager for this $28,000,000 project from April 2011 - ongoing that involves the installation of an underground 2.05 million gallon concrete tank and facility vault that includes odor control, controls for the storage facility, pumps, and a tipping bucket flushing system. The project also includes approximately 2,250 linear feet of 30-inch diameter sewer line and 10-inch diameter force main in a shared trench. Contaminated soils, asbestos, and other hazardous materials are encountered throughout the project.

    • Project Manager
      Mar 2011 - Jan 2012 · 11 mos

    • Emeryville, CA
      Project Manager. Sherwin Williams Company. Construction Oversight Services Remediation Project. Emeryville, CA Mr. Sanders provided Resident Project Representative and Construction Management services for this $17 million site soil and groundwater remediation project from March 2011- January 2012 at a former industrial coatings and pesticide manufacturing facility near Oakland, California, USA. Mr. Sander’s project role in this 80,000 BCY excavation project included assisting in the development of the innovative geochemistry evaluation of lead and arsenic in unsaturated and saturated soils, development of the overall remedial action objectives and the remedial approach. Mr. Sanders supported the client with the solicitation for remedial construction teams, assisted with reviews of qualifications of bidding firms, and contributed to the development of contract language consistent across three separate contracts executed with the client for construction and the transport and disposal of excavated soil and debris using ten separate waste profiles. The complexities of the project called for various remedial activities, many conducted simultaneously under construction management by Mr. Sanders including; soil vapor extraction prior to excavation, excavation of unsaturated soil from surface to groundwater; excavation of saturated soil to a depth of 25 feet below ground surface; Dewatering and solidification of saturated clayey soil from the excavation, using a soil amendment/absorbent; water treatment, Implementation of a site wide EMMP, sampling and characterization, and fill placement.

    • Project Manager
      Aug 2011 - Dec 2011 · 5 mos

      Project Manager/China Lake. IRT Site 68 Construction Oversight Services Remediation Project. Manager Services, Windermere CSO Reduction Project Construction Oversight and Capacity Building Mr Sanders served as the construction Project Manager on this $264,000 Desing/Build PCB remediation project for NAVFAC from August 1 through December 15th. This PCB/Dioxin Remediation project consisted of excavation and disposal of 800 CY of soil impacted by PCBs with concentrations greater than 13.3 milligrams per kilogram (mg/kg); The collection of confirmation samples from the excavation limits to analyze for Aroclors to confirm removal of soil impacted by PCBs; The backfill the excavation with clean imported fill soil; Cover the full extent of the contaminated area, approximately 1,875 CY delimited by the 1 mg/kg concentrations identified in previous investigations, with a cap layer of imported fill to minimize erosion and wind-transport of contaminants and restrict site access and land use by long-term implementation of engineering controls (fencing) and land use restrictions to comply with the low-occupancy industrial use compatible with the site conditions.

  • Construction Project Manager at CDM Smith
    Jul 2009 - Jul 2010 · 1 yr 1 mo

    Construction Project Manager/Cost Estimator - Marietta Sewage Lagoon Soil Cleanup, Whatcom County, Washington Mr. Sanders served for this $321,000 sewage lagoon project for the U.S. Army Corps of Engineers (USACE), Lummi Nation located in Whatcom County, Washington from July 30, 2009 – July 29, 2010. The project included a remedial investigation (RI) report, feasibility study (FS), sampling and analyses plan for surface water and sediment, the proposed plan, public meeting, decision document, remedial action design workplan, completion of lagoon dewatering, sediment removal and restoration, and the remedial action completion report documenting acceptance by all parties of response complete. Dewatering activities consisted of a 4-inch floating suction hose tied in to an 800-gpm skid-mounted sound-attenuated diesel pump discharging through a sediment bag to the grass field outside of lagoon berm. The total volume of water removed was approximately 1.8 million gallons. Access into the lagoon was improved using soil from the top of the berm and hog fuel. In order to keep personnel and equipment from contacting the affected material inside the exclusion zone, a layer of hog fuel was placed as needed for the excavator to reach all edges of the excavation area. Excavation occurred from the furthest point toward the access road. A CAT 320 Excavator was utilized to stockpile the material near the entrance to the exclusion zone, where Mr Sanders operated a JD 330 that was used to load disposal containers. The stockpiling effort gave the sediments some extra time to dewater before being loaded into the containers.Twenty-eight loads of affected sediments mixed with hog fuel were removed, totaling approximately 580 tons. The removal acceptance criteria were met by documenting that action achieved a 97 percent reduction in PCB and the concentration of PCB remaining in the lagoon were confirmed at 77 ug/kg and less than the no-effects level cleanup criteria of 168 ug/kg.

  • Project Manager/Construction Manager at Nuprecon LP
    Apr 2006 - Apr 2009 · 3 yrs 1 mo

  • Gary Merlino Construction Co (2 yrs 1 mo)
    • Project Manager/Construction Manager
      Apr 2004 - Apr 2006 · 2 yrs 1 mo

    • Project Manager/Estimator
      Apr 2004 - Nov 2004 · 8 mos

      Project Manager/Estimator, Foothills Trail, Phase 5B, Orting, Washington Orting to South Prairie. This was a $1,450,674 project for Pierce County from April 2004 to November 2004. Federal Aid No. STPE-2027(019): Construct approx. 17,472 lf asphalt trail, including four clearing and grubbing; perform 4,721 cy, roadway excavation, including haul; place 11,290 cy common borrow, including haul; perform 16,820 cy embankment compaction; perform 37,385 cy wetland excavation, including haul; perform 640 cy Class A structure excavation, including haul; install precast reinforced concrete, three-sided bridge, No. 23195-b; precast reinforced concrete, three-sided bridge, No. 23195-c; precast reinforced concrete, three-sided bridge, No. 23195-d; precast reinforced concrete, three-sided bridge, No. 23195-e; place 8,327 tons crushed surfacing base course; install 3,704 tons Class B asphalt concrete pavement; provide for seven acres seeding, fertilizing, and mulching; install 27,375 lf silt fence; 3,972 cy Type B topsoil; provide for 500 lf bank stabilization; provide 350 ton rock for rock wall; and provide for 22,624 sy construction geotextile for underground drainage.

    • Superintendent
      Jul 2004 - Sep 2004 · 3 mos

      Superintendent, Ross Point Slide Repair, Port Orchard, Washington Mr. Sanders served as the superintendent on this $3.2 million project for WSDOT located in Port Orchard, WA in Kitsap County from July 2004 to September 2004. Three challenging slide sections needed repair along hwy 166 in Bremerton, Washington during the summer of 2004. With limited time for hauling material off site, Mr. Sanders supervised; moving 180,000 cubic yards of material; complete 8.5 acres of clearing and grubbing, install 50,000 tons worth of quarry spalls, excavate 6,500 linear feet of horizontal drains and install 3,000 linear feet of 6- to 12-inch drain pipe. Slide Section 1 involved flattening the slope to a 2.5:1 with horizontal drains. Sections 2 and 3 involved slope excavation, installation of horizontal drains and rebuilding a quarry spall buttress. All of this was accomplished while working around steep slopes and sensitive bald eagle fledglings. The timing of this project brought several critical challenges with it. Due to the high demand for trucks during the peak of the construction season, the project team worked tirelessly to meet their goal of moving 6,000-8,000 cubic yards of material per day. The estimated need was for 30 trucks daily, yet crews were consistently able to meet their goals with only 22-26 trucks per day. The contract allowed for 45 working days, starting July 1st, 2004. Consequently, a major part of the timing challenge was found in tight road restrictions, which were limited to July 16th through August 5th, and August 16th through September 3rd. The project team completed the project on time while working 70-hour weeks without any injuries, therefore enabling SR 166 Slide Repair Project to serve as a model of safety and dedication to getting the job done right.

  • RCI ENVIRONMENTAL, INC. (6 yrs 2 mos)
    • Project Manager
      Mar 2003 - Sep 2004 · 1 yr 7 mos

      Project Manager, Kitsap County Conference Center, Bremerton, Washington Mr. Sanders served as the project manager for this $1,464,548 from March 2003 to September 2004. Excavation and transport of 20,000 cy of potentially contaminated material. Reroute, upgrade, and install new utilities (water, sewer, storm, and gas).

    • Project Manager/Construction Manager
      Aug 1998 - Apr 2004 · 5 yrs 9 mos

    • Project Manager
      Apr 2002 - Aug 2003 · 1 yr 5 mos

      Project Manager, FY02 MOCON Project P-701 Force Main Shipyard to WWTP-Pearl Harbor, Hawaii This was a $10,055,409 project for the U.S. Navy Facilities Engineering Command from April 2002 to August 2003. This project consisted of the installation of 9,000 lf of 32 inch HDPE force main from Pearl Harbor Naval Shipyard to Fort Kam Waste Water Treatment Plant, 500 ft. of horizontal drilling and 7,500 ft. of open trenching. Additional work included: 7,800 ft. of sliplining of existing concrete cylinder pipe with 24 inch HDPE. Other incidental work includes valve box installation, demolition, and piping modifications at Bishop Point Pump Station.

    • Project Manager, Ford Island Sewer Force Main
      Oct 2001 - Jul 2003 · 1 yr 10 mos

      This $5,767,677 project includes installing approximately 1820 meters of 500 mm high density polyethylene pipe to convey wastewater from Ford Island to the primary wastewater pumping station SY-001 and upgrade the pumping capacity of the existing Ford Island pump station and incidental related work. Upgrade of pumping station includes new wastewater pumps of higher capacity, upgrade of the odor control ventilation system, a new building to house a motor control center and back-up diesel generator with double walled fuel tank, new valves with valve pit, and new flow meter. Mr. Sanders was responsible for division one compliance with the Navy in addition to safety, subcontract management, contract management, schedule, budget, client management, and quality. He managed the installation of a 30-inch directional bore across the channel between Ford Island and Pearl Harbor. The bore was 2,300 lf and at the time of installation the longest ever performed for installing 20-inch diameter HDPE. The bore was challenging due to being drilled mostly through porous coral. The coral absorbed the drilling fluid causing a condition of “no return” with the drill cuttings. Mr. Sanders coordinated with the Navy to assume a shared risk and continue to push forward with the bore without circulation of drilling fluids. The bore was successful and due to an excellent guidance system hit its target within three feet. The project consisted of 1220 meters of open trenching. Mr. Sanders negotiated with the drilling subcontractor to procure a better value that was less costly than open trenching. A revised work plan was accepted by the Navy as well as a shared cost savings. The project proceeded with directional drilling greatly reducing the impact on Navy operations; impact on the base housing residents and directional drilling made the historical preservation requirements easier to achieve such as historical strafing marks from Japanese fighters and bombing marks that occurred during WWII.

    • Superintendent
      Jun 2001 - Dec 2001 · 7 mos

      Superintendent, Cascade Pole Site Sediments Remedial Action Project, Olympia, Washington This was a $3,894,758 project for the Port of Olympia from June 2001 -December 2001. This project included the following scope of work: excavation and dredging approximately 36,000 cubic yards of contaminated sediments at the Cascade Pole Site in Olympia. Temporary haul roads were constructed using steel plates and are timed to match low tide cycles. All excavations are backfilled with sand during the same tide cycle to prevent sloughing of contaminated sediments into the clean excavations. Sediment dredging is performed at high tide using a crane on a barge. The crane was equipped with an environmental bucket to minimize the potential release of contaminants during the dredging operation. Dredged areas are backfilled with sand after completion of the work. Final storm drain modifications and grading will be performed to control water in and around the containment cell and to direct the stormwater to the existing storm drain system. The site will be restored at completion of the project by hydroseeding and final landscaping.

    • Superintendent
      Oct 1999 - May 2000 · 8 mos

    • Tacoma, Washington
      Superintendent, Dock Street, Tacoma, Washington This was a $2,586,449 project for the City of Tacoma from October 1999 to May 2000. Complete roadway reconstruction including: storm, sewer, water piping with curb and gutter and asphalt from 21st to 15th on Dock Street. All work in contaminated soils. Environmental cleanup, soils handling and disposal included.